My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02737
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:39 PM
Creation date
10/11/2006 11:19:12 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.120
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1981
Title
Plan of Study: Grand Valley Unit Stage Two
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />C'1 <br />l'- <br /> <br />CHAPTER II <br /> <br />GENERAL APPROACH TO THE WORK <br /> <br />- <br /> <br />'-' <br />:::; <br />C) <br /> <br />?uggested Schedule of Key Public Involvement Events <br /> <br />Event number <br /> <br />1. Review mailing list <br />2. Establish meetings, agenda and program <br />outline with Grand Valley Salinity <br />Coordinating Committee (Executive Board) <br />3. Develop slide show for use in meetings <br />4. Brief news media <br />5. Consolidate existing notes from water <br />user groups <br />6. Conduct interviews with small water <br />users groups <br />7. Arrange media release to describe <br />principal alternatives <br />8. Meet with public to evaluate alternatives <br />and scope environmental issues <br />9. Meet to obtain input from coordinating <br />committee and water users for considera- <br />tion in plan selection <br />10. Prepare news release describing preferred <br />plan <br />11. Meet with coordinating committee to refine <br />preferred plan. Discuss environmental, <br />archeological, and social implications <br />of plan <br />12. Prepare summary report on public involvement <br />activities <br /> <br />..... <br />;:~;.,}:~::: <br />''":>j,e;-' <br /> <br />Approximate date <br /> <br />Late 1981 <br /> <br />Late 1981 <br />Late 1981 <br />Late 1981 <br />Late 1981 <br />Early 1982 <br />Late 1982 <br />Late 1982 <br /> <br />Early 1983 <br /> <br />Early 1983 <br /> <br />Mid 1983 <br /> <br />Mid 1983 <br /> <br />Note: the terminology used in this document for scheduled items <br />generally conforms to the following: <br /> <br />Early calendar year = January through April <br />Midcalendar year = May through August <br />Late calendar year = September through December <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.