My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02622
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:49 PM
Creation date
10/11/2006 11:14:09 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.400
Description
Fryingpan-Arkansas Project - Reports
State
CO
Basin
Arkansas
Water Division
5
Date
4/1/2003
Author
US DoI BoR
Title
Draft Environmental Assessment For the Pueblo West Pipeline and Pumping Station Project
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7-1596B 19.89) <br />. eurea~J of'Rf.clamation <br /> <br />Appendix A <br /> <br />l.'" ,"'~ .." ,"', <br />t1t)~ ;:, <br /> <br />OCT 2 4 2002 <br /> <br />EC-1340 (PSunde) <br />ENV-4.00 <br /> <br />., <br /> <br />MEMORANDUM <br /> <br />To: Supervisor, U.S. Fish and Wildlife Service, Ecological Services, <br />Colorado Field Office, Lakewood, Colorado <br /> <br />From: . ~ Alice Johns trJ..JlCY- Jly <br />~Q Chief, Resources Division <br /> <br />Subj ect: <br /> <br />Endangered Species Act (ESA)- Request for Information and Coordination- <br />Proposed Pueblo West Pipeline, Pump Station and Diversion Structure -,- Fryingpan- <br />Arkansas Project - Colorado <br /> <br />The United States Bureau of Reclamation (Reclamation) is currently preparing an Environmental <br />Assessment (EA) on an amendment to an easement willi. Pueblo West Metropolitan District <br />(Pueblo West) to construct, operate, and maintain River Pump Station No.2, 36-lnch raw water <br />pipeline, diversion and intake structure, and emergency standby generator below Pueblo Dam <br />(Affected area: NE Y. Section 36, SE Y. and NW Y. of Section 25, SW Y. of Section 24, E Y, of <br />Section 23 and Section 14, T20N, R66W, 6thpM) (See Attachment 1). <br /> <br />.CUrrently, Pueblo West relies on the pump station located Y. mile downstream of Pueblo Dam on. <br />the north bank of the Arkansas River. The existing pump station pumps up to 12 million gallons <br />per day (MOD) of water from Pueblo Dam's South Outlet Works into the 24-inch pipeline that <br />connects to the Pueblo West's Water Treatment Plant. The existing pipeline is approximately <br />4 miles long. Additionally, Pueblo West has a riprap diversion structure (diversion structure), <br />which helped to accommodate temporary pumps placed in the river. <br /> <br />The proposed action is to amend an existing easement with Pueblo West to permit the <br />construction, maintenance, and operation of a new river pump station with a maximum designed <br />. pumping capacity of approxImately 18 MOD to supplement the existing pump station capacity of <br />approximately 12 MOD. The new river pump station would be constructed approximately <br />1/4 mile downstream of Pueblo Dam near the existing pump station. The new river pump station <br />would pump water from the Arkansas River into a new 36-inch pipeline that would generally be <br />laid adjacent to the existing 24-inch pipeline. The new pipeline would be approximately <br />20,805 linear feet and would be completely buried. Approximately 3,945 linear feet of the <br />pipeline would be constructed across Reclamation property. <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.