Laserfiche WebLink
<br />.' -',,_ ~r_- <br /> <br />P, ~T , _ ~ "'-'~i;~:;;"':':--''''':<;~1':.' ~_. _. <br />',_.;.:" "I. ' <br /> <br />.~':.~"7;'; <br />-,c.' .: <br /> <br />. _-y~~ -'!'Y~&:,'~_'?,-.~;~ ",;>::",.,.,...<, <br /> <br />.;-~,~\-::.--._(. <br /> <br />. #~-,':;"?;<i'....-.-,..,~t*<~ <br />?~'~4 -,:---.~-.-", '.,:.. -', ','.';!_ ~~"~>". <br />-'. ~'?-'!-:,"2 ~- --': --'~-:'. -. ;;_,_::',;':2~~:';;1J.' .~_ <br />,- ~ <br />1 <br />, ~ <br />-i <br /> <br />25. <br /> <br />~ <br />N <br />N <br />C'l <br />C <br />. <br /> <br />income and expense. <br /> <br />Ey knowledge of the Bureau's business <br /> <br />leads me to believe that the load factor of the system will <br />increase during 50 years and that an average of 55% may be <br />safely used for studies of this nature over a period of 50 <br /> <br />years. <br /> <br />Cn page 6 of lir. Sandsl report he shows a total <br />generating capacity of 987,000 kW, at an average load fac- <br />tor of 49.4% which equals the firm obligation of <br />4,277,000,000 kw-hrs. per year. ~ith gt% loss as assumed <br />by Mr. Sands this is an equivalent of 903,563 kw. delivered <br /> <br />in Los Angeles. <br />Cn page 10 of Mr. Sands I report he assumes a total <br />installation of six transmission circuits, which would mean <br /> <br />. <br /> <br />that the delivered load on each circuit would be 150,930 kw. <br /> <br /> <br />rhis is in excess of the safe transmission capacity for <br /> <br />stability on the type of transmission system assumed by lir. <br />Sands. ro provide the quality of service required in a <br />large metropolitan ~rea, the safe delivered capacity should <br />not m~terially exceed 120,000 kw. per circuit, which would <br /> <br />require at least seven transmission circuits for primary <br /> <br />energy only. <br />While it is true some allocation of investment in <br /> <br />generating capacity is allocable to secondary energy, this <br /> <br />condition does not exist concerning transmission lines, for <br /> <br />their capacity is not a variable like generating c~p~city <br />which .is affected by the head in the reservoir. rhe matter <br /> <br />. <br /> <br />A. B. Roberts <br />