Laserfiche WebLink
<br />..",~- <br /> <br />--~"'"--:~~ -- <br /> <br />~:"".~..:__r__:"". <br /> <br />, ~'~:'o--~---,-,,,,.,,w.---- <br />. - . <br /> <br />- -~~~, ~o_"-~7'-~~~?3?,~~7.7' ~~::,:.:~::~~~~~ <br /> <br />M <br />N <br />N <br />N <br /> <br />24. <br /> <br />. <br /> <br />sixteen units arc r8quired during periods of 10'" "'ater it <br /> <br />is true that durin6 periods of normal flory additional <br />capacity is available in the units for generating second- <br /> <br />ary energy. :t, therefore, 1s possible that some equit- <br /> <br />able charge should be made to the goner~tion cost of <br /> <br />secondary energy. <br /> <br />l.;r. S"nds used the maximum 'l.nnu",l fir'll obl1g",tions <br />in his study, ~hich according to the contract is <br />4,277,000,000 k"'-hrs. occurring in the contract ye'l.r of <br />1943-4tf. rhe average annu".l obliga.tion over tho remain- <br />ing 43 years of the contract period is 4,OgO,OOO,OOO kry-hrs. <br /> <br />I'he 'J.mount of seconchry energy avail9.ble is incapable of <br /> <br />. <br /> <br />exact determination but might be estimated from a study of <br /> <br />the hydrogr9.ph prepared by the Recl"~at~on Jureau in <br /> <br />August 1937, '~hich ShO'7S ".n estimated operation of the dam <br /> <br />and reservoir for future years, based upon actual records <br /> <br /> <br />of river no'" for the last 40 years. rhe economical use <br /> <br />of thc amount of secono?,ry energy that 1~ill be available <br />is incapable cf determination. <br />rho estimates of future kilo'~att-hours and peak <br />demand rmpee.ring in my report on pp.ge 39 of the "CfficiRl <br />St9.temlont of the Jur\'llu of Po~'er and Light", dated <br />Kovcmber 30, 1937, as referred to in ~r. Sands' report, <br />results in an average load factor of approximately 50% <br /> <br />during a 15-year period. l'hese estimates ~ere intended to <br /> <br />. <br /> <br />be conserv9.tive for the purpose of estimating future <br /> <br />A. 3. Roberts <br />