Laserfiche WebLink
<br />~lb~" <br />N <br />N <br />N <br />c:: <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />- ., -:-', ''''.'_.h'_ ".~ <br /> <br />-~S' --~'::-~-_<~ <br /> <br />-->~~-y~"<?-': ~ . ~~ ;:9" '"'~ =>_ ~'"" <br />- ~"-~_:'i~~::,,:,_/j.. ~;;:~:-::-'.>~"'-':?_-:'_,,:.-c* <br /> <br />-<---<:-<~~- <br /> <br />"~-"?'.\7)~P-t~_'1 :' <br /> <br />~':~->;~'h_Y: <br /> <br />26. <br /> <br />of determining the value of seconde.ry energy, ho",ever, <br /> <br />seems relatively unimportant in this problem due to the <br /> <br /> <br />small ~mount of revenue ~hich ~ill be derived therefrom <br /> <br />and in the future its value ~ill be determined by a formula <br />included in rhe !'hir:'l Circuit Contract, ",hich no"! exists <br />bet,neon the Bureau of Po"'er and Light and the United States <br /> <br />Government. <br /> <br />If it is assumed the entire output of primary <br />energy at Boulder Po~er Plant would be delivered to the Los <br />Angelos metropolitan fl.rea, there "'ould be required three <br />groups of circuits, consisting of t~o groups of two circuits <br />each an~ one group of three circuits, totalling at least <br />seven circuits in all. Zach group of circuits ~ould require <br />its o"'ll steam standby spinning reserve to insure the proper <br />reliability of service for transmission. ~he minimum steam <br />standby for all three groups "'ould be 24c ,cee kl7., '1Thich is <br />only sufficient in a system of this size to provide against <br />the loss of a double circuit to.ner line. <br />While I do not agroe mith fur. Sands I basic assump- <br />tions of delivering Boulder Canyon po~er over long distance <br />transmission lines at system load factor, either from an <br />economic standpoint or from the standpoint of reliability <br />of service, nevertheloss ::: have made a parallel study, the <br />details for "'hich are sho"~ in rable B, making certain ob- <br />vicus corrections as previously set forth in order to get <br /> <br />fl.. J. Rc'oerts <br />