Laserfiche WebLink
<br />'_.IO,H <br /> <br />0, <br />.... <br />N <br />l:\l <br />C. <br />. <br /> <br />. <br /> <br />. <br /> <br />~ """------" <br /> <br />- '-';"'C-_~.-_- <br /> <br />-"C".,-~._~,-- c"'"' ~ <br />- "W;~J!~7.:~"~--~->'-~'~:t::~~f-';J <br />- - - ^-- - '::' ,:--;;.;,~~:- ",-:;,~ <br /> <br />~'~}'<;""".~.:-~"""'-" <br /> <br />~ <br /> <br />20. <br /> <br />plus fuel oil equivalent to 615 kw-hrs. per barrel of fuel <br />oil for present efficiency, and 665 kw-hrs. per barrel of <br />fuel oil for estimated steam plant efficiencies in the <br />near future. rhis present efficiency is equivalent to that <br />obtainec'! at present by the Port ',Vashington Steam Plant, <br />near Liil\l1aukGe, Wisconsin, and the future efficiency is <br />equivalent to that obtained in several mercury vapor plants <br />already installed and expected to be obtained by a 2400- <br /> <br />pound steam plant no~ under construction. <br /> <br />rhe fixed charges for public o'vnership and private <br />ownership as stated previously, covering interest and <br />amortization (or rate of return), operation, maintenance, <br /> <br />depr'9ciation, taxes, etc., "rere applied to the investment <br /> <br />cost to obtain the total annual charges exclusive of fuel <br />ana. falling "'ater. 1'0 these annual charges were added the <br />cost of fuel for various prices of fuel oil to obtain the <br />total cost of generatinb ana transmitting Boulder Dam <br />energy to Los Angeles at 72.5.% annual load factor, ".1th <br />steam pe~~ for delivering the energy to the system at 55% <br /> <br />annual load factor. <br /> <br />: then calculated the cost of generating the total <br />of 1,652,000,000 k"'-hrs. at 55;b load factor in a substi- <br />tute ste~~ plant located at Los Angeles. Phis steam plant, <br />in ordier to a.eliver an an.l1ual peak of 343,000 k'.,., ',"ould <br />have a reserve capacity of at least 20%, making the total <br /> <br />A. 3. Roberts <br />