My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02536
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:24 PM
Creation date
10/11/2006 11:11:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
10/31/1938
Author
Roberts A. B.
Title
Report of Competitive Value of Falling Water for Primary Energy at Boulder Dam in Competition with Steam Power at the Load Center
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.'_ "__---:-'__.~~-~-..- _'-7'~j"~_" <br />-" - - <br /> <br />-- -'-"':'-t':~;:,-"'~'; <br /> <br />._~_.,__ ,:r,,::~""-7 <br /> <br />-::c';;;Y'''1i;.>;,,:--''_''):," <br /> <br />--~""-""-'- ,;::~,~.'-r~,f,....~,.., -'W,:_?'>,~.',~~-_:-.-'-. ~.~ <br />.:~__': __ - -':t~{~)~ <br /> <br />o <br /> <br />C'.J <br />N <br />N <br /> <br />ft <br /> <br />21. <br /> <br />installed capacity 411,600 k~. manufacturer1s rated cap- <br />acity, which, at $g7.50 per k~., ;~uld require an invest- <br />ment cost of ~36,015,000. Applying the fixed charges <br /> <br />covering all costs except fuel, and adding the fuel costs <br />at various prices, produced the annual cost of generating <br />this energy in the substitute steam plant. From these <br /> <br />total costs, : subtracted the respective costs of gener- <br />ation and transmission by the Joulder and steam systems <br />(exclusive of falling ~ater) and obtained the annual <br />amount available for falling ~'ater at each price of fuel <br />oil. Jy dividing eacA of these annual amounts available <br />for fe.lling "!ater by 1,647,000,000 kr'-hrs. of primary <br /> <br />. <br /> <br />energy at Boulder Dam, the following results ~ere obtained <br />for the competi ti ve values of falling "'ater for primary <br /> <br />energy in mills per kiloryatt-hour at Boulder Dam: <br /> <br />Competitive Value :of Falling 'Hater <br />For Primary ~nergy <br />~ills per Kw-hr. at Boulder Dam <br />Based on Based on <br />Fixed Charges per Fixed Charges <br />Jureau of If Privately <br />Po"'er e.nd Light C'med <br /> <br />Price of Fuel eil <br />per bbl. <br />Prcsent Steam Plant 2ff. <br />.,,; .90 <br />.95 <br />1.00 <br />1.10 <br />Future Steam Plant Zff. <br />;;iI.IO <br />1.20 <br /> <br />. <br /> <br />Mills nor Kw-Hr. <br />- .737 <br />.g63 <br />.941 <br />1. 095 <br />.nl <br />1.112 <br /> <br />]['i118 per Kw-hr. <br />.511 <br />.5M <br />.665 <br />.g19 <br />.695 <br />.g3g <br /> <br />A. 3. Roberts <br />
The URL can be used to link to this page
Your browser does not support the video tag.