My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02536
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:24 PM
Creation date
10/11/2006 11:11:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
10/31/1938
Author
Roberts A. B.
Title
Report of Competitive Value of Falling Water for Primary Energy at Boulder Dam in Competition with Steam Power at the Load Center
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'-"'77~~. -.- <br /> <br />."','"".,;;:;"..... ......: <' <br /> <br />.---'-: '( ../-- -~~~:3>- <br /> <br />.'.,~_.:-;-----~~" <br />.."-~ <br /> <br />.- - y-~~/:~-:-~ :O'-~'~...~:if;,.~-o- ~~~,?~:-'~~;f;r~~~;'tl <br />, c.;~:-:;. <br /> <br />.<<> <br />- <br />N <br />N <br />c:: <br />. <br /> <br />19. <br /> <br />.., <br />I <br />I <br /> <br />to 1,523,000,000 kw-hrs. delivered at Los Angeles. The <br />s~fe delivered capacity of tho two circuits is 240,000 kw. <br />As previously m<.Jntioned under the hending "Hydro versus <br />SteD.Dl Plants", this 240,000 kw. should be 70% of the system <br /> <br />pcnk, the ro~~inlng 30% to 00 cnrriod by steam plant, from <br /> <br />w~ich it is determined that the system peak should be <br /> <br />343,000 kw. and the ste,~ pe~k 103,000 kw. for lowest de- <br /> <br />livered cost of 8n~r6Y to tho system. 343,000 kw. peak at <br /> <br />a load factor of 55% would require 1,652,000,000 kw-hrs. <br /> <br />per yoro.r. of which 1,523,000,000 kw-hrs. :'.re obt,",ined from <br /> <br />:9ouldor D.~m, L.l ".ving 129,000,000 kw-hrs. to be gunerntod <br /> <br />by steron plant. <br /> <br />This transmission system would require, ~s reserve, <br /> <br />. <br /> <br />ste~ plant c,~acity equivalent to one transmission circuit, <br /> <br />or 120,000 kw. In addition, thoro would be required 103,000 <br /> <br />kw. of steam peaking plus 20% reserve, mnking a total of <br /> <br />244,000 kw. of ste~m plant, manufacturer1s rated capacity. <br /> <br />With this system as a basis, and applying the unit <br /> <br />costs as s~t forth hereinbefore, the investment costs were <br />obtained for each of the following separately: Generating <br />machinery at Boulder, Boulder Transmission Line including <br /> <br />switching and rec~iving stations, and steam plant. <br /> <br />Tho barrels of fuel oil consumed per year in the <br />steam plC'.nt vrr>.s bro.sod upon the: formula 0.4 of a barrel of <br />fuel oil per yero.r per kilowatt of steam plant capncity, <br /> <br />. <br /> <br />A. B. Roberts <br />
The URL can be used to link to this page
Your browser does not support the video tag.