My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02505
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:18 PM
Creation date
10/11/2006 11:09:23 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/20/1984
Author
PSIAC
Title
Minutes of the 84-1 Meeting - September 20-21 1984
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />UTAH: Price-Wellinqton Watershed <br /> <br />A pre-authorization request is being prepared for a water conservation <br />and land treatment watershed. <br /> <br />WATERSHED CONSTRUCTION <br /> <br />:ALIFORNIA: Central Sonoma (Spring Creek) <br /> <br />The EIS was finalized and modifications supplemented in the work <br />plan. The sponsors are working on designing structural measures. <br />Mitigation plantings are planned for installation in FY-85, <br /> <br />March- Ke 11 oqq <br /> <br />Work or environmental clearance of this project has slowed because <br />the sponsors are investigating additional alternative on two con- <br />struction units. The other three units of channel work will be <br />deleted from the plan. <br /> <br />Tehachapi Watershed <br /> <br />The first unit of construction of Tehachapi Channel has been completed, <br />Design of the Antelope Dam and diversion are to be completed in <br />December 1984. A contract should be ready for award in FY-85, <br /> <br />Beardsley <br /> <br />Plans and specifications are being prepared on Unit IV and Ferro <br />Debris Basin. Construction of Unit IV is planned for FY-85. <br />Construction of Ferro Debris Basin is planned to start later in FY-84. <br /> <br />Carpinteria Watershed <br /> <br />No change in progress, <br /> <br />Llaqas Creek Watershed <br /> <br />Construction Unit 2A on Llagas Creek has been completed, A contract <br />was awarded in June 1984 for construction Unit 2B. Plans and <br />Specifications for Construction Unit 2A-1 were completed in May 1984, <br />Construction is scheduled to begin in August 1984. Design of <br />Construction Unit 3A. 9A are underway. Construction is scheduled for <br />FY-85. <br /> <br />Santa Ynez Flood Prevention Project (PL-534) <br /> <br />Construction is underway on Unit 6. Design of Unit 7 is progressing <br />on,schedule. Construction is scheduled to start on Unit 7 in FY-85. <br /> <br />\) '10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.