My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02505
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:18 PM
Creation date
10/11/2006 11:09:23 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/20/1984
Author
PSIAC
Title
Minutes of the 84-1 Meeting - September 20-21 1984
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Apache Junction-Gilbert Watershed <br /> <br />RWCD Floodway Reach 5 surveys and geological investigation have <br />been completed. <br /> <br />Harquaha1a Valley Watershed <br /> <br />Designs for the Centennial Levee Reach 1 were completed by Franzoy, <br />Corey and Associates, consultants for the Harquahala Irrigation <br />District, <br /> <br />Invitations to bid for the Centennial Levee Reach 1 have been issued <br />by the US Bureau of Reclamation. Bids are to be opened August 29, 1984. <br /> <br />A subsidence monitoring survey has been completed for the Harquaha1a <br />and Sadd1eback FRS. <br /> <br />Design of Centennial Levee Reach 2 is underway. <br />Vanar Wash Watershed <br /> <br />Repair of the Vanar Diversion by installation of three baffle chute <br />structures has been completed. <br /> <br />White Tanks Watershed <br /> <br />A subsidence monitoring survey has been completed on the White <br />Tanks 3 and 4 FRS. <br /> <br />LIFORNIA: Upper Stony Creek <br /> <br />The sponsors of this watershed protection project submitted an <br />application in November 1983. Previous studies and some pre- <br />application assistance made it possible to develop a pre-authorization <br />report by January 1984. The request for planning authorization was <br />denied, <br /> <br />South Fork Kinqs River <br /> <br />This also is a new application. Planning authorization was granted <br />in April 1984. Studies to date consist mostly of water quality <br />monitoring. The purpose of the project is drainage for salinity <br />control, <br /> <br />Cull Canyon <br /> <br />This is a new application for watershed protection and flood <br />prevention. The draft pr.e-authorization has undergone State Office <br />review and submission to Portland is planned contingent on adequate <br />public support. <br /> <br />b8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.