<br />in the OM stage. The Project Overlook is complete. The Fish Hatchery has <br />been completed and is being operated by the California Department of Fish and <br />Game. The Visitors Center has been completed and is operational. A report is <br />being prepared by the U.S. Fish and Wildlife Service and the San Francisco <br />District regarding the protection of the Peregrine Falcon. <br /> <br />6. Indian Bend Wash, Arizona. There are four remaining contracts in the <br />construction phase of the Indian Bend Wash Flood Control Project. The <br />scheduled completion date is September 1983. <br /> <br />7. Santa Maria Levees, California. A construction contract was awarded in <br />June 1981, for levee and channel improvements along Santa Maria River and <br />along Bradley Canyon to correct project c\eficiencies. The scheduled <br />completion date is March 1982. <br /> <br />8. Small Projects. <br /> <br />Allenville, Arizona. A contract was awarded in January 1981 to initiate <br />razing of the old site and construction of replacement housing and support <br />facilities. The scheduled completion date is 13 September 1981. <br /> <br />OPERATION AND MAINTENANCE PROGRAM: <br /> <br />1. Regulatory Permit Program. During thephiod 1 ,January 1981 through 30 <br />June 1981, the three District offices, under the cognizance of the Division <br />Office, issued the following permits including letters of permission: <br /> <br />Permit Au thori ty and District <br />Brief Description Sacramento Los Angeles San Francisco <br />Section 10 84 58 101 <br />(regulating structures or work <br />in or affecting navigable waters <br />of the United States) <br />Section 404 63 6 30 <br />(regulating discharge of dredged <br />or fill materials into waters of <br />the United States) <br />Section 10 and Section 404 33 20 42 <br />(regulatory actions requLrLng <br />both Section 10 and Section 404 <br />permits) """I8"il 84 <br /> 173 <br /> <br />2. Emergencies. There were no emergency actions taken during the period <br />1 January 1981 through 30 June 1981. The levee rehabilitation work is <br />continuing on Webb Tract. <br /> <br />2 <br />