My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02240
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:49:59 PM
Creation date
10/11/2006 11:00:20 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
8/1/1974
Author
USWRC
Title
1975 Water Assessment-Missouri River Basin-75 Water Assessment-Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Varia tion from cen fral case Anqlysis variables <br />4. Full development of resources on Water supply <br /> Indian reservations (USDI) Crop production <br /> Indian unemployment <br /> Indian per capita income <br /> Land use <br /> Soil loss <br /> Wet soil conversion <br /> Fish and wildlife habitat .~ <br />5. Improved irrigation water use Water supply <br /> efficiency (USDA with USDI) Cost of irrigated crop production ,; <br /> Value of water saved <br /> Effect on riparian vegetation <br /> Soil loss <br /> Wet soil conversion <br />6. Water use price-cost sensitivities Water supply <br /> (WRC) Agriculture production <br /> Agriculture employment <br /> Manufacturing output <br /> Land use <br />7. Alternative levels of flood plain Flood damages <br /> regulation (CE and USDA) Land use <br /> Economic activity impacts, where significant <br /> <br />Agency Responsible: Indicated in description above. <br /> <br />Phase V Nationwide Analysis Wrap-Up <br /> <br />Activity One: Nationwide Appraisal of Previous Phases. (June 1975) During this <br />activity, a detailed evaluation and synthesis of the results of the previous nationwide analysis <br />activities will be made. During the evaluation and synthesis process, specific attention will be <br />given to the evaluation of the economic, environmental, and social Impacts of the central-case <br />future and variations therefrom to select a set of future projections (modified central case) <br />upon which the Council will base its national priorities analysis activities unless convinced ,~ <br />otherwise by the results of the specific-problem analysis. <br /> <br />Agency Responsible: NPA Committee and WRC staff. ~ <br /> <br />Activity Two: Compilation of Nationwide Analysis Results. (June 1975) During this <br />activity the information resulting from Activity One will be compiled in a format suitable <br />for inclusion in the draft national assessment report and for use by the regional sponsors in <br />the specific-problem analysis. <br /> <br />Agency Responsible: NPA Committee and WRC staff. <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.