My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02209
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:35:17 PM
Creation date
10/11/2006 10:58:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
6/10/1982
Author
USCOE/WAPA
Title
Public Information Forum, Post 1989 Power Marketing Plan - Customer Comments
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-. ".....'-:'. <br /> <br />August 4, 1982 <br /> <br />. .,-,' <br />'.I!n r;. j...(,' <br />:"':M"': U j V~ <br /> <br />--.-. ,--~.__., <br /> <br />~r, A. M. Gabiola <br />Western Area Power Administration <br />Department of Energy <br />? 0, Box 11606 <br />Sal~ Lake City, Utah 84147 <br /> <br />-" .. <br />., ~ <br /> <br />Re: <br /> <br />Salt Lake City Area Consolidated Power Marketing Plan <br /> <br />....-~--_._.. . <br /> <br />Dear Mr. Gabiolal <br /> <br />The following are Arizona Electric Power Cooperative's comments on the <br />proposed Salt Lake City Area Consolidated Marketing Plan which was reviewed <br />at the Public Information Forum on June 10, 1982, in Salt Lake City: <br /> <br />1. Marketin~ Area <br /> <br />The Cooperative supports the marketing area described in <br />CRSP general power marketing criteria, dated February 9, 1978. <br />We believe that this marketing area should be retained as is, <br /> <br />2. Renewal of Existin~ CRSP Allocations <br /> <br />The Cooperative believes that the allocations to the ~orthern <br />and Southern Basins should r~in the same as was originally <br />intended in 1962. Included in the announced 1962 CRSP Mar- <br />keting Criteria, dated March 9, 1962, is a statement that <br />"the Southern Division is pe1"Jll&nently allocated 7% of the <br />system's winter capability and 20% of the summer capability." <br /> <br />The Cooperative also believes that allocation of CSRP power and <br />energy for the post-1989 period should be to the existing cus- <br />tomers on same basis as originally agreed to by the U. S. Bureau <br />of Reclamation. These past actions have caused the Cooperative <br />to expect that new future contracts will be executed on the <br />basis of these allocations. <br /> <br />3. Contract Term <br /> <br />The Cooperative believes that the contract term for post-1989 <br />contracts should be at least 20 years. If projec~ed hydro- <br />logical conditions change after the initial la-year period, <br />contracts could be reopened for the purpose of readjusting all <br />allocations of power. A provision could be included in the <br />contracts for this purp~se. <br /> <br />2 <br /> <br />-._..............._............,A,Il......_._....,..._.__......._. ......_,_._ ~ __u#.._~...~..~. b. . <br />orlzono electric ~i"W"" ,..""..........._~l.._ .-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.