My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01994
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP01994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:50 PM
Creation date
10/11/2006 10:47:37 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/1/1983
Title
Monthly Progress Report - Aquatrain Project - June 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />C,, <br />, <br /> <br />~ <br />~~.~ <br /> <br />loop and Stages I and II. <br /> <br />Work continued on Tasks 4 and 5 of the corridor study to <br />develop screening criteria for determining rights-of-way. <br /> <br />Met with Forest Service personnel in Price, Utah, to determine <br />their concerns about crossing the Manti-LaSalle National <br />Forest. <br /> <br />~,) <br /> <br />Work was begun on Work Order No. 2 to Bureau of Land Management/ <br />Reclamation Interagency Agreement to define tasks and funding <br />for the EIS. <br /> <br />Work continued on Reclamation/U.S. Forest Service Memorandum <br />of Understanding (MOUl to define Forest Service participation <br />in corridor study, EIS preparation, and rights-of-way. <br /> <br />Determined funding and personnel requirements for FY84 BLM <br />corridor work. Forwarded to USBR Regional Office for processing. <br /> <br />6.2 ANTICIPATED JULY EVENTS <br /> <br />MOU with U.S. Forest Service to be signed. <br />BLM Work Order No.2, defining work and funds available <br />for preparation of EIS, to be finalized. <br /> <br />Work to begin on Working Agreement to Reclamation/Aquatrain, <br />Inc. Cooperative Agreement to define work and funding for <br />project EIS and planning of Stages I and II. <br /> <br />BLM to brief Reclamation on Task 5 of the corridor study <br />on July 12. <br /> <br />BLM to submit draft of corridor study to Reclamation for <br />review and comments. <br /> <br />Future energy demand study statement of work to be completed <br />by Western Area Power Administration. <br /> <br />Project status meeting with Los Angeles Department of Water <br />and Power is scheduled. Preliminary project report will <br />be presented. <br /> <br />6.3 ANTICIPATED AUGUST EVENTS <br /> <br />Working Agreement to Reclamation/Aquatrain, Inc. Cooperative <br />Agreement to be signed. <br /> <br />Project EIS public involvement plan completed in cooperation <br />with BLM EIS Services. <br /> <br />Final report on corridor study to be submitted to Reclamation. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.