Laserfiche WebLink
<br />". <br /> <br />. <br /> <br />. <br /> <br />~~ <br /> <br /><, <br /> <br />"<:t' <br /> <br />4.2 ANTICIPATED JULY EVENTS <br /> <br />.....",j <br /> <br />c..) <br /> <br />Efforts to seek additional equity partners will continue. <br /> <br />C~ <br />.' <br /> <br />5.0 SUBTEAM: TECHNICAL/ENGINEERING (Legal) <br />5.1 JUNE EVENTS <br /> <br />Met with King-Wilkinson representatives who agreed to investigate <br />alternative saline water cooling towers. <br /> <br />Information provided to International Engineering Company <br />for use in estimating costs for test loop and Stages I and II. <br /> <br />Conferred with Stearns-Roger on their preliminary design <br />of a dry flue gas desulfurization system to attain 70-75 <br />percent removal of CO from stack emissions. It appears <br />that AQUATRAIN could ~eliver needed trona and nahcolite <br />at lower cost. <br /> <br />5.2 ANTICIPATED JULY EVENTS <br /> <br />Finish subteam's portion of preliminary project report. <br />Complete subteam's input to PROPLAN. <br />Assemble more information on fine coal cleaning processes. <br />Work with International Engineering Company on test loop and <br />Stages I and II engineering. <br /> <br />Identify alternative sources of CO2. <br /> <br />5.3 ANTICIPATED AUGUST EVENTS <br /> <br />Begin detailed work on test loop and Stage I engineering. <br /> <br />Possible meeting with ESU, Inc., to learn of their management <br />system to reduce project costs. <br /> <br />5.4 CURRENT PROBLEMS <br /> <br />Determining basic cleaning potential of western coal. <br /> <br />Determining how to schedule and track batches of commodities <br />from numerous sources in varying amounts to delivery points in <br />an integrated pipeline system. <br /> <br />6.0 SUBTEAM: ENVIRONMENT/CORRIDOR/FEDERAL PERMITTING/ <br />ENERGY MANAGEMENT (Fite) <br />6.1 JUNE EVENTS <br /> <br />Work continued on preliminary project report which contains <br />development plans, appraisal level cost estimates, proposed <br />construction schedules, and financing options for the test <br /> <br />3 <br />