My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01994
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP01994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:50 PM
Creation date
10/11/2006 10:47:37 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/1/1983
Title
Monthly Progress Report - Aquatrain Project - June 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />". <br /> <br />. <br /> <br />. <br /> <br />~~ <br /> <br /><, <br /> <br />"<:t' <br /> <br />4.2 ANTICIPATED JULY EVENTS <br /> <br />.....",j <br /> <br />c..) <br /> <br />Efforts to seek additional equity partners will continue. <br /> <br />C~ <br />.' <br /> <br />5.0 SUBTEAM: TECHNICAL/ENGINEERING (Legal) <br />5.1 JUNE EVENTS <br /> <br />Met with King-Wilkinson representatives who agreed to investigate <br />alternative saline water cooling towers. <br /> <br />Information provided to International Engineering Company <br />for use in estimating costs for test loop and Stages I and II. <br /> <br />Conferred with Stearns-Roger on their preliminary design <br />of a dry flue gas desulfurization system to attain 70-75 <br />percent removal of CO from stack emissions. It appears <br />that AQUATRAIN could ~eliver needed trona and nahcolite <br />at lower cost. <br /> <br />5.2 ANTICIPATED JULY EVENTS <br /> <br />Finish subteam's portion of preliminary project report. <br />Complete subteam's input to PROPLAN. <br />Assemble more information on fine coal cleaning processes. <br />Work with International Engineering Company on test loop and <br />Stages I and II engineering. <br /> <br />Identify alternative sources of CO2. <br /> <br />5.3 ANTICIPATED AUGUST EVENTS <br /> <br />Begin detailed work on test loop and Stage I engineering. <br /> <br />Possible meeting with ESU, Inc., to learn of their management <br />system to reduce project costs. <br /> <br />5.4 CURRENT PROBLEMS <br /> <br />Determining basic cleaning potential of western coal. <br /> <br />Determining how to schedule and track batches of commodities <br />from numerous sources in varying amounts to delivery points in <br />an integrated pipeline system. <br /> <br />6.0 SUBTEAM: ENVIRONMENT/CORRIDOR/FEDERAL PERMITTING/ <br />ENERGY MANAGEMENT (Fite) <br />6.1 JUNE EVENTS <br /> <br />Work continued on preliminary project report which contains <br />development plans, appraisal level cost estimates, proposed <br />construction schedules, and financing options for the test <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.