My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01994
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP01994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:50 PM
Creation date
10/11/2006 10:47:37 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
6/1/1983
Title
Monthly Progress Report - Aquatrain Project - June 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(',,,", <br /> <br />. <br /> <br />. <br /> <br />:> <br /> <br />~ <br /> <br />'"':-..,,~ <br /> <br />(..-} <br /> <br />Task force comprised of representatives of Western and interested <br />utilities to be formed to conduct future energy demand study. <br /> <br />.::..) <br /> <br />7.0 SUBTEAM: PLANNING COORDINATION/REPORTS/PUBLIC INVOLVEMENT <br />(Stefanec) <br /> <br />7.1 JUNE EVENTS <br /> <br />Planning Coordinator conducted interviews for four vacancies. <br />Selection on hold. <br /> <br />PROP LAN has resulted in Project Master Schedule completed <br />(attached). Use of more sophisticated software opportunities <br />will occur in increments as project becomes better defined. <br />Schedule reflects short-term flag dates agreed to by Barrett, <br />Clinton, and McKeever. <br /> <br />Expression of interest from Terra Therma (for Redstone Corporation) <br />to provide their saline water discharge to a Glenwood Canyon <br />collection system. Stefanec coordinating with Grand Junction <br />to set up jOint discussion. <br /> <br />7.2 ANTICIPATED JULY EVENTS <br /> <br />Planning Coordinator to conduct follow-up advance work in <br />Colorado while awaiting clearance to begin in Utah, Nevada, <br />Wyoming, and California. <br /> <br />Stefanec (with McKeever and Clinton) to brief four groups <br />in Grand Junction on July 7. <br /> <br />Discussion with UC-700 regarding anticipated support for <br />preparation of Preliminary Decision Document and Plan Formulation <br />Working Document. <br /> <br />Complete update for project briefing packet. <br /> <br />7.3 ANTICIPATED AUGUST EVENTS <br /> <br />Advance work in Utah, Nevada, Wyoming, and California. <br /> <br />Clinton, McKeever, and Stefanec to make status briefing <br />to Garfield County Commissioners on August 15 in Glenwood <br />Springs. <br /> <br />7.4 CURRENT PROBLEMS <br /> <br />Need clearance for Planning Coordinator to proceed with <br />advance work in Nevada, Utah, Wyoming, Arizona, and California. . <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.