My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01912
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:22 PM
Creation date
10/11/2006 10:44:29 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.129.D
Description
Upper Gunnison Project
State
CO
Basin
Gunnison
Water Division
4
Date
3/1/1964
Author
USDOI - BOR
Title
Reconnaissance Report - Upper Gunnison Project-Colorado - March 1964
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />1.1") <br />1.1") <br />..-t <br /> <br />CHAPTER VI <br /> <br />BenefitdCost Analysis <br /> <br />SMALL DEVELOPMENT <br /> <br />The benefit-cost ratio for the small development is estimated at <br />2,05 to 1 with all benefits considered and at 1,32 to 1 with considera- <br />tion of only direct benefits, Costs of replacement storage at the Cure- <br />canti unit were not included in the benefit-cost analysis since they are <br />considered sunk costs and therefore not properly a factor in estimating <br />the justification of future construction, <br /> <br />Total benefits of the development are estimated at $683,400 annual- <br />ly as shown below, <br /> <br />Irrigation <br />Fish and wildlife <br />Recreation <br />Total <br /> <br />Direct <br />benefits <br />$256,500 <br />129,000 <br />~6.200 <br />4 1,700 <br /> <br />Indirect <br />and <br />public <br />benefi ts <br />$241,700 <br /> <br />241,700 <br /> <br />Total <br />$498,200 <br />129,000 <br />~60200 <br />6 3,400 <br /> <br />Average annual e~uivalent costs are estimated at $334.075 as shown <br />below, <br /> <br />Construction cost <br />Interest during construction <br />Total project investment <br />Ann~al operation, maintenance. <br />and replacement costs <br />Share of Colorado River <br />Storage project costs <br />Total <br /> <br />Total <br />cost <br />$7,,019.500 <br />49~.075 <br />7,'57 ,575 <br /> <br />Financial Analyses <br /> <br />Average <br />annual <br />e~uivalent <br />cost <br /> <br />$239,835 <br />65,040 <br /> <br />2~,200 <br />33 ,075 <br /> <br />For the cost allocation and repayment analyses, the costs previous- <br />ly estimated were increased by the costs of storage needed at the Cure- <br />canti unit for replacement of the Uncompahgre project supply, Replace- <br />ment costs were based on use of 2,600 acre-feet of active storage in the <br />Curecanti unit and include $135,000 in construction costs based Oft $52 <br />per acre-foot of capacity, $10,400 in interest during construction based <br />on $4 per acre-foot, and $260 annually in operation. maintenance, and <br />replacement costs based on $0,10 per acre-foot, <br /> <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.