My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01852
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:05 PM
Creation date
10/11/2006 10:40:34 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.850
Description
Miscellaneous Small Projects and Project Studies - MWSI
State
CO
Basin
South Platte
Date
9/17/1993
Author
Hydrosphere Inc.
Title
Proposal for the Metropolitan Water Supply Investigation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"' <br /> <br />" <br /> <br />Metropolitan Water Supply Investigation Proposal <br />Hydrosphere, Inc. <br /> <br />Septmber 17, 1993 <br />Page 44 <br /> <br />Refine Study Plan <br /> <br />Purpose <br /> <br />This task will produce a more specified and directed work plan based on the results of <br />the initial scoping meetings. The work plan will identify specific data requirements and <br />sources, geographic scope, analytical requirements and tools, investigations necessary to define <br />facility needs and financial, environmental and institutional issues to be investigated. The <br />results of this task will be used to guide the remainder of the Study process. <br /> <br />Methodology and Evaluation Techniques <br /> <br />The Project Team would incorporate the results of the scoping meetings into a draft <br />Refined Study Plan. This draft would include detailed descriptions of the tasks required for <br />data collection and analysis and investigation of the water supply opportunities. The Refined <br />Study Plan would identify which data were readily available in useful form from other ongoing <br />studies and from State agencies, and which data would have to be gathered and developed <br />through special studies. <br /> <br />The draft would be reviewed by the Study Management team and TSC, and comments <br />would be reflected in a Final Study Plan. <br /> <br />Linkages With Other Tasks <br /> <br />This task will rely upon results of the scoping process described above and will <br />specifically define other tasks necessary for completion of the MWSI project. <br /> <br />Likely Sources of Information To Be Used <br /> <br />The primary source of information for refinement of the study plan will be input from <br />TSC, the Project Management Committee and the consulting team. <br /> <br />Anticipated Problems <br /> <br />Once the most promising water supply opportunities have been identified, it will be <br />necessary to determine the appropriate level of detail required for effective reconnaissance <br />level evaluation. The water supply systems associated with the targeted opportunities are <br />highly evolved, very complex and have been subjected to many previous studies. It will be <br />necessary to quiclcly and efficiently synthesize vast quantities of information to determine <br />which sources are most relevant and most likely to provide an appropriate level of detail. <br /> <br />As described above under the scoping task, scheduling problems related to coordination <br />with the other imponant ongoing water supply planning efforts will need to be resolved. <br /> <br />Deliverables <br /> <br />A draft and final Refined Study Plan will be prepared. <br />Cost <br /> <br />The initially estimated budget for this task is $6,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.