Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />. <br /> <br />Investigation p.rogram - Part I (cont'd) <br /> <br />December 1962 <br /> <br />Report <br /> <br />Schedule of Operations <br /> <br />SHIDLER RESERVOIR, <br />SIILT CREEK, OKLA <br /> <br />W IILNlJr RIVER, <br />KANSAS <br /> <br />WAURIKA RESERVOIR, <br />BEAVER CREEK, OKLA <br /> <br />....w <br /><........,; ~ <br />L'"? <br /> <br />.--' <br /> <br />= <br />o <br /> <br />Scope & Location <br /> <br />Survey-scope study of a dam and reser- <br />voir on Salt Creek near Shidler, Okla- <br />homa, for flood control, water supply <br />& allied purposes. <br /> <br />Survey-scope study of Walnut River Basin <br />in interest of flood control, water sup- <br />ply & other purposes. <br /> <br />Survey-scope study of Beaver & Cow <br />Creeks to deteDDine justification for <br />construction of reservoir for flood <br />control & allied purposes at.Waurika <br />site. <br /> <br />Studies are to be completed & report prepared <br />by end of FY 1963. Draft of report is to be <br />furnished State & Federal agencies for field- <br />level review prior to submission of report to <br />higher authority. <br /> <br />Survey investigation to be completed on Towanda, <br />El Dorado & Douglass Reservoirs & local flood <br />protection projects at El Dorado & Winfield. <br />Field-level review of draft by State & Federal <br />agencies & completion of report are scheduled <br />for summer of 1963. <br /> <br />Report is scheduled to be submitted to higher <br />authority in Dee 1962. <br /> <br />Page 4 of 6 <br />