Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />. <br /> <br />r-; <br /> <br />.......,J <br /> <br />~:"';> <br />..-< <br />':=l <br />o <br /> <br />Investigation Program - Part I (cont'd) <br /> <br />December 1962 <br /> <br />Report <br /> <br />Schedule of Operations <br /> <br />LAKE WICHITA, <br />HOLLIDAY CREEK, <br />TEXAS <br /> <br />McALESTER & YALE, <br />OKLAHOMA, WATER <br />SUPPLY FACILITIES <br /> <br />POTEAU RIVER, <br />OKLA & ARK <br /> <br />RED RIVER <br />COMPREHENSIVE REVIEW, <br />OKLA, TEX, ARK & LA <br /> <br />SHERWOOD RESERVOIR, <br />MOUNTAIN FORK, <br />-OKLAHOMA <br /> <br />Scope & Location <br /> <br />Survey-scope study considering modifi- <br />cation of existing IIDII-Federa 1 Lake <br />Wichita; channel improvements on lIclli- <br />day Creek; & diversion of floodwaters <br />from Lake Wichita to Little Wichita <br />River. <br /> <br />Investigation of remedial measures re- <br />quired as a result of effects of <br />Eufaula & Keystone Reservoirs on exist- <br />ing water supply facilities. <br /> <br />Survey-scope study to determine whether <br />further improvements for flood control & <br />related water conservation uses are <br />advisable & to determine if improvements <br />for navigation on the Poteau River to <br />the vicinity of Poteau, Oklahoma are <br />adviaable at this time. <br /> <br />Survey-scope study to develop a compre- <br />hensive integrated plan of improvement <br />for water'resource development, includ- <br />ing navigation, flood control & preser- <br />vation of land in main valley of Red <br />River. (Report is assigned to New <br />Orleans Dist, LMVD. Tulsa Dist to <br />furnish data for reach from Denison Dam <br />to Fulton, Arkansas.) <br /> <br />Survey-scope study of multiple-purpose <br />reservoir located upstream from Broken <br />Bow Reservoir on Mountain Fork in south- <br />eastern Oklahoma. <br /> <br />Studies for selection of basic plan & report <br />preparation are programmed for continuation in <br />FY 1963, with completion of report in FY 1964. <br /> <br />Basic studies are being accomplished in con- <br />junction with project planning. Survey report <br />is tentatively programmed for FY 1964. <br /> <br />Preliminary hydrologic, engineering & economic <br />studies will be continued. The Soil Conserva- <br />tion Service plans to participate in the study <br />with reference to watershed programs under PL <br />566. Tentative plans will be formulated in <br />FY 1963; more detailed investigations are to <br />be made after FY 1963. <br /> <br />Studies are continuing on tentative plans for <br />navigation, flood control, bank stabilization, <br />preservation of land & other water uses. Cur- <br />rent fiscal year work will consist of hydro- <br />logic, economic & other engineering studies. <br />Completion of the report is currently scheduled <br />for FY 1965. <br /> <br />Investigation will be initiated in current <br />fiscal year. Study will be coordinated with <br />the Red River report listed above. <br /> <br />Page 3 of 6 <br />