My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01808
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01808
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 11:15:50 PM
Creation date
10/11/2006 10:39:31 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
OK
Date
11/7/1962
Author
Charles L Hipp
Title
Corps of Engineers 1959-1960 - Corres., Reports 1961-1963 - Investigation Program - U S Army Corps of Engineer District, Tulsa Oklahoma, for Fiscal Year 1963 (July 1, 1962 to June 30, 1963)
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />. <br /> <br />. <br /> <br />Investigatign Program - Part I (cant'd) <br /> <br />December 1962 <br /> <br />Report <br /> <br />Schedule of Operations <br /> <br />ARKANSAS RIVER INTO <br />EUFAIJLA. RESERVOIR, <br />OKLAHOMA <br /> <br />BOSWELL RESERVOIR, <br />BOGGY CREEK, <br />OKLAHCI1A <br /> <br />CIMARRON RIVEll <br />(& DRY CIMAllBON) , <br />NEW MEl{, COLD, KANS <br />& OKLA <br /> <br />CRUTCHO CREEK, <br />OKLAHOMA <br /> <br />HALSTEAD, KANSAS, <br />LITILE ARK RIVEll, <br />CHANNEL IMPROVEMENT <br /> <br />HEAD OF ARKANSAS RIVER <br />NAVIGATION PROJECT, <br />VERDIGRIS RIVER, <br />OKLAHtMA <br /> <br />("--J <br />(~ <br />;...., <br />.-i <br />o <br />c::> <br /> <br />Scope & Location <br /> <br />Survey-scope study to determine the <br />practicability of extending navigation <br />from the Arkansas River by canal into <br />Eufaula Reservoir. <br /> <br />Survey-scope study to determine whether <br />the authori>:ed Boswell Reservoir should <br />be modified in the interest of flood <br />control, water supply & allied purposes. <br />Study includes consideradon of alterna- <br />tive reservoirs. <br /> <br />Comprehensive survey-scope study of <br />flood problems & water resources of the <br />entire Cimarron River Basin. <br /> <br />Survey-scope study of flood problems of <br />Crutcho & Little Crutcho Creeks at & in <br />vicinity of Oklahana City, Del City & <br />Midwest City. OklahClll8. <br /> <br />Survey-scope study of flood problem on <br />Little Arkansas River at Halstead, <br />Kansas. <br /> <br />Investigation to establish the location <br />of the turning basin to be provided by <br />the Federal Government at the upper limit <br />of the project. <br /> <br />The investigation, initiated in FY 1962, will <br />be continued. Coordination with other field <br />agencies may be required in FY 1963. Report is <br />scheduled for completion in FY 1964. <br /> <br />Survey studies are essentially complete. Prep- <br />aration of report, field-level review of report <br />draft by State & Federal agencies & completion <br />of report are scheduled for current fiscal <br />year. <br /> <br />Survey studies are under way & will be con- <br />tinued. Coordination with other Federal & <br />State agencies will be required. Completion of <br />report is tentatively scheduled for summer 1965. <br /> <br />Engineering & economic studies will be continued. <br />Survey report is currently programmed for com- <br />pletion in the spring of 1964. <br /> <br />Investigations are under way of a diversion <br />plan, channel improvement plan & other alterna- <br />tives. Report preparation is programmed for <br />continuation this FY & completion in FY 1964. <br /> <br />Basic studies are being accomplished in con- <br />junction with project planning. Survey re- <br />port is tentatively programmed for FY 1964 <br /> <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.