Laserfiche WebLink
<br />~ <br />I <br /> <br />December 1962 <br />PART II: SMALL PROJECTS FOR FLOOD CONTROL & RELATED PURPOSES (Projects which do not require specific Congres- <br />sional authorization & in which, under provisions of See 205 of the Flood Control Act of 1962, Federal partic- <br />ipation cannot exceed $1,000,000. Detailed investigation & appropriate field-level coordination with other <br />agencies & interests are required.) <br /> <br />Report <br /> <br />Schedule of Operation <br /> <br />DUCK CREEK, OKLA <br /> <br />. <br /> <br />MOUNTAIN CREEK NEAR <br />WISTER, OKLA <br /> <br />PLUM CREEK, TEXAS <br /> <br />SAND CREEK, <br />NEIITON, KANSAS <br /> <br />. <br /> <br />SKIATOOK, OKLAHOMA <br /> <br />T1!RKEY CREEK, <br />BARTLESVILLE, OKLA <br /> <br /> t~ <br /> '---J :r <br />. ' ----' <br />I 'r c:...... <br /> ~ <br /> 0 <br /> <br />Scope & Location <br /> <br />Study of flood problem on Duck Creek <br />at Stillwater, Oklahoma. <br /> <br />Study of flood problem on Mountain <br />Creek at Wister, Oklahoma. <br /> <br />Study of flood problem on Plum Creek <br />at Wichita Falls, Texas. <br /> <br />Study of flood problem on Sand Creek <br />at Newton, Kansas. I,. <br /> <br />Study of flood problem on Bird Creek <br />& tributaries at Skiatook, Oklahoma. <br /> <br />Study of problem in Pennington Addition <br />in Bartlesville caused by floods on <br />Turkey Creek. <br /> <br />Initiation of detailed investigations proposed. <br />-, <br /> <br />Initiation of detailed investigations proposed. <br /> <br />Detailed investigation of channel improvement <br />is essentially complete. Further coordination <br />with local interests is under way. The report <br />is scheduled for completion this fiscal year. <br /> <br />Detailed investigation is essentially complete <br />for channel improvements on Sand Creek through <br />urban area of Newton & clearing & snagging of <br />channel about 2 miles upstream & 2-1/2 miles <br />downstream of town. Report is scheduled for <br />completion this fiscal year. <br /> <br />Initiation of detailed investigations proposed. <br /> <br />Investigation of flood control measures has <br />been initiated & will be continued. Channel <br />improvements & a small reservoir are under <br />study. Report is scheduled for completion in <br />FY 1964. <br /> <br />Page 5 of 6 <br />