Laserfiche WebLink
<br />.....,- <br />e,? <br />..:;) <br />..-.j most instances when it is apparent the delivery will suh- <br /> <br />{:"} <br /> <br />......::} <br /> <br />, <br />stantially exceed the need for more than a day or so the <br /> <br />ditch company will request a reduction in their storage <br /> <br />release. <br /> <br />During the latter part of the 1968 season the Jaroso Mutual <br /> <br />Ditch Company was engaged in an extensive ditch lining <br /> <br />program. Because of the requi:ement to request storage <br /> <br />water the latter part of one week for use during the fol- <br /> <br />lowing week and because of changes in the ditch lining <br /> <br />contractor schedule there was considerably more water in <br /> <br />the Cerro canal for delivery.to the Jaroso area than their <br /> <br />system could accomodate, especially during the first week <br /> <br />in September. During the first week in September the ditch <br /> <br />company informed the Watermaster that there was an excess <br /> <br />of flow and requested their storage release from Costilla <br /> <br />reservoir be reduced. Coincident with their request the <br /> <br />generator at Costilla dam, used to provide power to-operate <br /> <br />the radio communication system, failed. As a result of <br /> <br />the generator failure and the travel time from Costilla <br /> <br />. <br /> <br />\ <br /> <br />12 <br />