My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01724
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01724
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:27 PM
Creation date
10/11/2006 10:37:46 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8503.400.B
Description
Costilla Creek/Rio Grande Basin
Basin
Rio Grande
Water Division
3
Date
1/1/1968
Title
Activities of the Costilla Creek Watermaster - 1968 Irrigation Season
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~---~------ <br /> <br />C') <br />C'J <br />\-::.> <br />..-l <br />( ..' manage the waters of the system as efficiently as possible <br /> <br />, ~ <br />...-...., <br /> <br />the gates on Costilla dam were completely closed for a <br /> <br />.' <br /> <br />portion of June 20 all of June 21 and 22 and for a portion <br /> <br />of June 23, 1968. During this period the flood gate at <br /> <br />the Cerro diversion dam was opened to allow the flow orig- <br /> <br />~ <br />inating below Costilla dam to flow down the creek. Jaroso <br /> <br />Mutual employed-. drag1ine and cleaned the upper portion <br /> <br />^,-.,~~- <br />of the canal during June 21 and 22, 1968. On June 23, <br /> <br />1968 the reservoir gates were opened and distribution of <br /> <br />~, <br /> <br />the waters of the system returned to normal. <br /> <br />Delivery of Water to Eastdale Reservoir <br />During the Irrigation Season <br /> <br />During the first part of September Mr. Joe Espinoza, Water <br /> <br />. Commissioner for COlorado, noted that water had passed the <br /> <br />Eastdale intake canal gage on several occasions during <br /> <br />August and September. Mr. Wayne Crosby asked New Mexico <br /> <br />to investigate the matter and determine whether the water <br /> <br />delivered past the Eastdale intake gage should not have <br /> <br />been returned to Costilla Creek at the Cerroh~adlng for <br /> <br />I <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.