My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01579
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:44 PM
Creation date
10/11/2006 10:32:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
12/22/1997
Author
UCRBRIP
Title
1997 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Opinion. Service personnel responsible for the Biological Opinion <br />were involved in developing the schedule for the consolidated report. <br />All investigators involved in the consolidated report are also <br />involved in writing their own reports for individual studies under <br />the Aspinall Umbrella. Many of these investigators are also involved <br />in writing reports for studies being conducted under the Flaming <br />Gorge Umbrella. Consequently. not all individual studies funded <br />under Aspinal have been completed and not all of the scheduled <br />synthesis work could be completed in FY-97. Initial data analysis <br />and sythesis was done. but additional work on synthesizing the <br />studies can not be completed until the individual reports are <br />available for use. Most of these reports should be submitted for <br />peer review in the next couple of months. FY.-97 funds were carried <br />forward to cover this work in FY-98. <br /> <br />VII. Recommendations: Continue as planned. <br /> <br />VIII. Project Status: Project is behind schedule: Individual reports for <br />most studies conducted under the Aspinall Umbrella have not been <br />completed. Completion of synthesis will have to wait until the <br />individual reports are completed. <br /> <br />IX. FY 97 Budget <br /> <br />A. <br /> <br />Funds Provided: <br /> <br />FWS <br />CDOW <br />UDWR <br /> <br />85.0 K <br />17.5 K <br />17.5 K <br />65.0 K <br />55.5 K <br />CDOW 17.5. UDWR 17.5) <br />o <br /> <br />B. Funds Expended: <br />C. Difference: <br />(Carry Over: FWS 20. <br />Publication Charges: <br /> <br />D. <br /> <br />X. Status of Data Submission: NA <br /> <br />XI. Signed: C.W. McAda. December 5. 1997. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.