My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01579
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:44 PM
Creation date
10/11/2006 10:32:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
12/22/1997
Author
UCRBRIP
Title
1997 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY 97 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: ~ <br /> <br />I. Project Title: ASPINALL STUDY-Synthesis of studies conducted for the <br />Biological Opinion on the operation of the Aspinall Unit. <br /> <br />II. Principal Investigator(s): <br /> <br />Frank K. Pfeifer. Project Leader <br />Charles W. McAda. Fishery Biologist <br /> <br />764 Horizon Drive. South Annex A <br />Grand Junction. Colorado B1506 <br />(970) 245-9319: Fax 245-6933 <br />Frank Pfeifer@FWS.GOV <br />Chuck McAda@FWS.GOV <br /> <br />III. <br /> <br />Project Summary: <br /> <br />Fifteen related studies are being conducted to provide data to be <br />used in the Biological Opinion on the operation of the Aspinall Unit. <br />In addition, many other studies have been, or are being conducted in <br />various parts of the Upper Colorado River Basin that will be useful <br />to the Biological Opinion Process. It is critical that participants <br />begin the consolidation process for these diverse. but related <br />studies. <br /> <br />This scope of work began the process of consolidating the information <br />currently being collected throughout the Gunnison and Colorado rivers <br />that is directed toward the Aspinall Biological Opinion. <br /> <br />IV. Study Schedule: 1995-1997. Final Report 1998 <br /> <br />V. Relationship to RIPRAP: Colorado River Action Plan: Gunnison River: <br />I.A. Initially identify year-round flows needed for recovery: and <br />V.A. Conduct research to acquire life history information and <br />enhance scientific techniques required to complete recovery actions. <br /> <br />VI. Accomplishment of FY 97 Tasks and Deliverables. Discussion of Initial <br />Findings and Shortcomings: <br /> <br />The major accomplishments of 1997 involved coordinating among the <br />different researchers, assigning tasks. and ensuring that deadlines <br />were consistent with RIPRAP deadlines for the Aspinall Biological <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.