Laserfiche WebLink
<br /> <br />Jeff McCoy <br />November 9, 1994 <br />Page 2 <br /> <br /> <br />replacement resources will match customer's requirements under <br />the changed power supply picture created by the GCPA. <br /> <br />3. Where the Western resource in the past has been a low <br />load factor resource based on hydrology studies, we su~pect that <br />the new generation and utilization pat.tern of those resources may <br />now provide excess off-peak energy. If such off-peak energy is <br />available, it should be offered to current Western customers to <br />be purchased as a modification of existing contracts and at off- <br />peak rates. <br /> <br />This energy could be adjusted seasonally based on <br />availability and customer needs. Deliveries of energy during the <br />off-peak time need not be limited to the Contract Rate of Deliver <br />(CROD), recognizing, however, that at no time should capacity on- <br />peak exceed CROD. <br /> <br />4. We believe that all of the above should become <br />modifications to and part of the current agreements with <br />and should, therefore, appear on Exhibit A to be adopted <br />normal procedures as outlined in current contracts. <br /> <br />We submit this respectfully for your consideration. <br />be available to discuss these concepts in more detail at <br />, request. <br /> <br />Sincerely, <br /> <br />=:t-'---~'/7 A'L dJ <br />'-- l'n'f('/.{~/~' <br /> <br />Ke neth A. Winder <br />Manager - Engineering <br /> <br />Western <br />through <br /> <br />We will <br />your <br />