My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01576
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:43 PM
Creation date
10/11/2006 10:32:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP
Basin
Colorado Mainstem
Date
3/1/1988
Title
Replacement Resources Processes - Final Methods Report - Appendices
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />94 <br /> <br />96 <br /> <br />9V <br /> <br />98 <br /> <br />99 <br /> <br /> <br /> <br />Relationship to Replacement:Resources Process: .The SLCA's commit- <br />ment level decision, together Iwith Interior's decision on the GCD EIS, will <br />help define the amount of el~ctrical power resources the SLCA may need <br />to acquire to meet its contractual obligations through September 2004. <br /> <br />Glen Canyon Dam EIS i <br /> <br />The Bureau of Reclamation ~ublished its draft EI5 (DEI5) in January 1994 <br />that recommended changing the operations of Glen Canyon Dam to <br />minimize adverse impacts or the downstream environmental and cultural <br />resources within the Grand Canyon. The DEIS presented and analyzed the <br />potential impacts of nine alt~rnatives that covered a range of possible <br />operations of the dam. The ~ine possible operation alternatives included <br />three that would provide st~ady releases and six that would provide <br />various levels of fluctuating Ireleases. <br /> <br />A 90-day public comment ~eriod followed the release of the DEI5. <br />During this time period, Reflamation received more than 33,000 com- <br />ments from interested pub lips on the DEIS and the preferred alternative. <br /> <br />The Preferred Alternative (the Modified Low Fluctuating Flow Alternative) <br />identified in the DEIS was similar to the Interim Operating Criteria that <br />have been in effect since A;ugust 1991. It included limiting daily fluctua- <br />tions to between 5,000 cfs [(185 MW)' and 8,000 cfs (296 MW), limiting <br />maximum flows to 20,000)cfs (740 MW),and limiting up and down <br />ramps to 2,500 cfs (93 Mvyl per hour and 1,500 cfs (56 MWl per hour, <br />respectively. The Preferre<;l Alternative also included elements of the draft <br />Biological Opinion, incluqing endangered fish research releases. As a <br />result of public commentsireceived by Reclamation, the Preferred Alterna- <br />tive has been modified increasing the maximum flow to 25,000 cfs (925 <br />MW), the upramp rate to ~,OOO cfs (148 MW), and to remove the endan- <br />gered fish research flows. r <br /> <br />Another element ofthe D~15 was an Adaptive Management Program. <br />Adaptive management is pefined as a process by which refinements to <br />dam operations could be iimplemented as more is learned about the <br />effects of the selected optrations on downstream resources. <br /> <br />Following a review and ~nalysis of public comments, the final EI5 is <br />scheduled to be released; in February 1995 and the ROD after an audit by <br />the Comptroller Generallas required by the GCP Act. <br />, <br /> <br /> <br />1 Assuming 37 MW per) ,000 cfs release. <br />r <br />, <br />, <br />, <br />i <br /> <br />· NOTE: Yvestern estimates that the Benefit/Cost Audit by the <br />Comptroller General will require one year to complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.