My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01576
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:43 PM
Creation date
10/11/2006 10:32:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP
Basin
Colorado Mainstem
Date
3/1/1988
Title
Replacement Resources Processes - Final Methods Report - Appendices
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />11/94 <br />Public Meetings! <br />Comments <br /> <br />S/95 <br />Public Meetings! <br />4/95 Comments <br />Dh.RPT. <br /> <br />,[ <br />3/96 W96 <br />Final RPT. RPT, to . * <br />Congress 3/98 (Assumed Deadline) <br />Repon to Congress <br /> <br /> <br />The SLCA proposes that the Methods Report be based on certain funda- <br />mental assumptions. Some of the assumptions the SLCA has identified <br />include: <br /> <br />Scope - The analysis to identify:replacement resources will address a <br />wide range of potential replaceinent requests by firm power customers in <br />response to final decisions in b6th the Glen Canyon Dam EIS and SLCA! <br />IP Electric Power Marketing EIS'. Power losses at other SLCA!IP power- <br />, plants due to constraints placed on those facilities also affect the need for <br />replacement resources. ' <br /> <br />, Baseline - The commitment le~el of power and energy as delineated by <br />the Preferred Alternative in the)final SLCA!IP Electric Power Marketing EIS <br />will be the baseline marketing level for analysis. The Preferred Alternative <br />in the final Glen Canyon Dam iEIS will help establish the baseline market- <br />able resource. These baseline~ may be modified by the Records of <br />Decision for both EISs. . <br /> <br />Risk levels. Marketable Hydro 'Power. The SlCA established a level of <br />acceptable risk when it originally contracted for its post-1989 market <br />levels. That is, it assumed thatJor nine out of ten years, no additional <br />purchases will be required to (neet its contractual commitments. The <br />SLCA may maintain this samelassumed level of risk for the purpose of <br />analysis. [ , <br /> <br />Replacement Options - The c~mposition of replacement power may vary <br />among (a) sole replacement by the SLCA, '(b) partial replacement by the <br />SLCA and partial replacement by the customer, or (c) sole replacement by <br />the customer. . <br /> <br />Supplv-side Options - The SLCA will consider both existing and new <br />supply-side options, as well'~s renewable resources. <br /> <br />Energy Efficiencv Options - T~e SlCA will encourage energy efficiency. <br />! <br />! <br />Recognition of Customer DSM programs - It is expected that the Methods <br />Report will acknowledge tho~e program benefits demonstrated by <br />customers in their own IRPs.:' , <br /> <br />Weightinll- The SLCA will evaluate all replacement resource options <br />using consistent economic eyaluation methods. <br /> <br />Methods Report Development <br /> <br />96 97 i 98 99 <br />! <br />! <br />* NOTE: Assumed, based o~ projected March t 996 issuance of Glen Canyon <br />Dam EIS Record of Decisi~n. <br />
The URL can be used to link to this page
Your browser does not support the video tag.