My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01576
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:31:43 PM
Creation date
10/11/2006 10:32:30 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP
Basin
Colorado Mainstem
Date
3/1/1988
Title
Replacement Resources Processes - Final Methods Report - Appendices
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. Cost. <br /> <br /> <br />The criteria and consideration~ that the SLCA must take into account <br />when it defines the "methods'~ for replacing lost Glen Canyon generation <br />are technical. economic and environmental. The SLCA expects to <br />, <br />develop fully those criteria an~ considerations. <br /> <br />Methods Considerationsiand Criteria <br /> <br />Some of the considerations that must be accounted for include: <br /> <br />. Electrical system operatio~ and reliability. <br /> <br />. Transmission interconnection and/or delivery points to access replace- <br />ment resources. ! <br /> <br />. Resource type (e.g. peaking, intermediate, or baseloadl. <br />. Environmental impacts. <br />. Other operational aspects. <br /> <br />Proposed Contents <br /> <br />~Iacement Resource Methods ReRQrt <br /> <br />Objectives: <br />State objectives & least.cost planning principles <br />GCP Act compliance <br />Replacement resource, least-cost option <br />Other objectives (e.g., promote renewable resource development, energy efficiencies, <br />minimize environmental impacts) <br /> <br />Scope: <br />Describe steps taken to develop scope of methods, application <br />Result of public consultation <br /> <br />Replacement Options: <br />Identify a full range of replacement resource options <br />Include potential Hoover integration; Other hydro integration options <br />For particular resources, if needed, assess additional authorities & limitations <br /> <br />Resource Analysis: <br />Define Resource Analysis IRP Principles and Criteria <br />Range of customer need, timing <br />Existing and new resources <br />Integrated Resource Planning methods (Supply- and !)emand-sidel <br />Performance Validation methods <br />Assess transmission system limitations and potential enhancements/modifications <br /> <br />Environmental Concerns: <br />Identify environmental impacts of replacement resources ;(e.g., air quality) <br />
The URL can be used to link to this page
Your browser does not support the video tag.