Laserfiche WebLink
<br />. -' nOl <br />. . , <br />(.oJlJ. <br /> <br />TABLE 2 <br /> <br />METROPOLITAN WATER DISTRICT <br /> <br />10 <br /> <br />MAIN AQUEDUCT FEATURES <br /> <br />JUlie 30, 1947 <br /> <br />"'l::,~TUIlE <br /> <br />Preliminary ~xpell~e <br />Right o( WRY, lands, and easelllents...... <br />Road!; . <br />Constrllctiull waler system.. <br />ConSITlIClion puwec system.. <br />Parker l1ullI. <br />Tunnels, concrete lined. <br />LUI-anll-l'(,\er conduits on <br />C"nt'l"l'l.': lineJ canals. . <br />Unlinell callal <br />SiphuIlS . <br />Tdeplwlle lines <br />Trallsrni.;;.'iion lines. <br />PUlllping plants and 4 camps. <br />C,..ne and C(.pper Basin rcservojr~... <br />Miscellan~olls <br /> <br />...153 miles <br />.....180 )lliles <br />......477 miles <br /> <br />..92.0lJ mile..; <br />........54.4.5 mile~ <br />..62.RI miles <br />1.05 miles <br />28..53 miles <br />430 miles <br />2.tO miles <br /> <br />TOlals <br />Grand Lotal <br />Dedllct: <br />Grant Public Works Administratiull for <br />Parker Dam. ..................... <br />Defense Plant Corporation fur ground wires <br />on Iran!:-mis~iun lines.................................. <br />Salvage sales and undi51riLIlleu overhead.. <br />Ca~h di-;,co\lots ................. <br />Unapplieu .....orkmen.s compensation.. <br />LiquidaLed damogcB ___""" <br />Totals <br /> <br />GraulI total deulIeliOllS <br />j\'el e')~( III June 30, 19.17... <br /> <br />OIUGI."<AL Co.., <br />TO <br />JULY 31, }I).II <br />S .1,63.3,660.07 <br />1,333,416.70 <br />1,057,001.45 <br />1<23.0.J.I.44 <br />1,331,043.18 <br />7.239.927.34 <br />7[1.288:162.99 <br />14.115,<169.66 <br />7.7.16,711..12 <br />143,~24.37 <br />9.1328,207.B~ <br />36+,248.24 <br />2.716,;J2H5 <br />15/JO-1-,7%.16 <br />1,056,548.23 <br />2.280,'185.47 <br /> <br />S I4n.862,361.I 6 $264,115.01l <br /> <br />$141,]26,476.24 <br /> <br />$ 600,000.on <br />253,~6L37 <br />2,150.613.80 <br />253,307.20 <br />777,538.04 <br />606,362.21 <br /> <br />$ 4,6.JI,OR2.6~ <br /> <br />S 'l.6..J.2,220.57 <br />$136.'1R-1.255.67 <br /> <br />ADDITIOI'.':> <br />AI'D <br />llETTEnMJ::r'\T!'I <br />TO D....1'E <br /> <br />$ 85,000.00 <br />149,998.06 <br /> <br />7,1::l1'J.l::llJ <br />21,307.22 <br /> <br />1,137.95 <br /> <br />$ 1,137.95 <br /> <br />PUJ11pi-U{J plauts <br /> <br />Water was pumped at Hayfield for delivery to Lake Mathews <br />from September 15 to November 1, 1946 and from May 16 to <br />June 30, 1947. Intake, Gene, Iron Mountain, and Eagle Mountain <br />pumping plants were operated as required to maintain storage at <br />Gene and Copper Basin reservoirs and to provide the required flow <br />to the Hayfield plant. Pumping at Hayfield was suspended from <br />November 1 to May 16 to permit work in the San Jacinto tunnel <br />('onsisting of additional grouting behind the concrete lining and <br />repair of breaks in the invert concrete. <br />