Laserfiche WebLink
<br />;i.';' <br /> <br />...... <br />1;..1 <br />","Ii. <br />(,(j <br /> <br />Projecc <br /> <br />Tocal WaCer Mgmc.- <br />Wasacch Front <br /> <br />Animas-La Plata <br /> <br />Uintah Unit <br /> <br />San Mi guel <br /> <br />West Divide <br /> <br />Upalco Unit <br /> <br />. <br /> <br />DPR or <br />Proposed <br />Feasibility <br />or Other <br /> <br />9/85 <br /> <br />3/19 <br /> <br />Slipped <br />Date of <br />Report <br /> <br />9/86 <br /> <br />8/18 7/82 <br />to 12/80 <br />to 10/31/80 <br />Co 7/82 <br />to 7/84 <br /> <br />4/80 <br /> <br />.9/19 <br /> <br />1/79 <br /> <br />to <br />to <br />to <br /> <br />7/80 <br />3/81 <br />9/80 <br />3/81 <br /> <br />to <br /> <br />5/80 <br />8/80 <br /> <br />9/79 <br /> <br />. <br /> <br />, <br /> <br />.. <br /> <br />Reasons for Slippage <br /> <br />2/81-Taken out of 8udget Estimates for FY82; <br />Will be put in as new start. <br /> <br />No change to DPR. 5/10/79 DES changed from <br />4/79 to 7/79-could not type Upalco and Animas <br />DES's as same time. <br />DPR approved 8/80. <br /> <br />On 7/4/79 slipped to 3/80 then to 1/82 then <br />Co 7/82. <br />8/20/79-Results of drilling on Whiterocks was <br />due 8/79 but was told would not ~et until 11/79. <br />In 10/79 changed from Plan A to B - Not <br />feasible. These problems caused slippage from <br />1182 to 7/82. 7/9/80-changed to Status State- j <br />ment due 12/80. <br />7/23/8o-Changed to SQecial Reoort due 2/80. <br />9/18/80~Ltr to be written - due Wash. 10/31/80. <br />9/18/8o-Decision made to do DPR on all-Indian <br />Unit - due 7/82. <br />1/15/81-RD's Itr to Provo moved DPR 2 years- <br />7/82 to 7/84. No special all-Indian report will <br />be written. <Slipped because of indecision of <br />Indians. ) <br /> <br />3/6/79-S1ipped from 4/80 to 7/80-Lack of viable <br />plan slowed study. 11/6/79-Meeting with Wash., <br />Durango, and R.O. decided Concluding Report <br />would be prepared. <br />12/S/79-RD met with water users and decided to <br />look at other alternatives. Changed DPR date <br />to 3/81 after 12/5/79 meeting. <br />S/80-Project still not feasible-changed to <br />Status Report. <br />8/14/8o-At Program Conf. decided to call <br />report "A Report" and send a letter report to. <br />Wash. for Congress - due 9/80. <br />Concluding report still scheduled for 3/81. <br /> <br />Slipped from 9/79 to 5/80 to 8/80 - Denver <br />design delay. 11/28/79-RO agreed to extend <br />study 3 mos. <br />7/8o-Decided Iv.D. not feasible so will write <br />a Status Report due 8/80. <br />8/14/80-Changed to "A Report" -still due 8/80 <br />with a letter report due 9/80. <br />Final Concluding report now scheduled for <br />3/81. <br /> <br />3 <br /> <br />Slipped from 1/79 to 3/79 to 7/79 to 9/79 <br />between 1/79 and 7/9/79-More exoloratorv drill- <br />in. on Taskeech. S/10/79-Necessarv to redesi.n <br />Dart of one feature which resulted in DPR not <br />being finished on time. Uoalco DPR aooroved <br />Mav 15. 1980. <br />