My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00967
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP00967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:38 PM
Creation date
10/11/2006 10:04:27 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1983
Author
DOI
Title
Salinity Control Program Study Report and Recommendations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br /> DPR or <br /> Proposed Slipped <br />~ Feasibility Date of <br />CJI Project or Other Report <br />~ <br />~ Diamond Fork 3/83 10/83 <br /> <br />Leland Bench <br /> <br />11/80 <br /> <br />10/82 <br /> <br />M&I Segment <br /> <br />12/78 <br /> <br />Utah Lake 1&0 <br /> <br />3/82 <br /> <br />3/85 <br /> <br />Grand Valley - <br />Stage One <br /> <br />11/78 <br /> <br />Grand Valley - <br />Stage 'two <br /> <br />Paradox Valley <br /> <br />6/82 <br />9/78 <br /> <br />3/85 <br /> <br />Nipple Bench PP <br /> <br />Dallas Creek (Ridgway)10/80 <br /> <br />Dolores (McPhee <br />&Towoac PP's) <br /> <br />11/80 <br /> <br />. <br /> <br />Reasons for Slippage <br /> <br />3/12/80 Itr-Additional time needed in field <br />office to prepare report. <br />6/l0/80-Provo ltr-Delayed because projected. <br />geological reports overlap start of designs by <br />2 to 3 months. <br /> <br />3/12/80 ltr-Additional time needed in field <br />office to prepare report. <br />6/10/80 Provo ltr-Lack of travel funds and <br />personnel - requirement of geologists to <br />monitor filling of Red Fleet Reservoir - <br />moved from 5/81 to 10/82. <br />9/8/80-provo asked to extend 1 year. Indians <br />have not made up mind on whether want project. <br />Extension not approved. <br />3/l6/8l-At PERT meeting decided to remove <br />from program. No work will be done till <br />Indians make decision. <br /> <br />DES slipped from 2/79 to 3/79 to 4/79; FES <br />slipped from 5/79 to 8/79 to 9/79 to 10/79 (EPA <br />would not agree with FES). <br /> <br />Change in priorities necessitated extending <br />Utah Lake and Irrigation Features. <br /> <br />Approval of DPR slipped from 2/79 to 5/79 to <br />7/79 to 9/80 back to 7/80 to 5/80 (Amendatol~ <br />legislation is delaying approval of start of <br />construction). Start construction pending <br />approval of amendatory legislation and signing <br />O&M Contract. DPR approved March 25, 1980. <br /> <br />Extended because of legislation delay. <br /> <br />No change. <br /> <br />2/l4/80-Start of investigation delayed 1 year <br />because of slip of 10 months on Glen Canyon PP_ <br />from 1983 to 1984. Unrealistic to start <br />Nipple Bench PP when G.C.PP not finished. <br /> <br />Suppl to DPR. Final Suppl due 3/81. <br /> <br />Suppl to DPR. Final Suppl due 5/81. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.