Laserfiche WebLink
<br />f-o <br />C." <br />.:::. <br /> <br />Project <br /> <br />".) <br /> <br />Power Peaking Study <br />Flaming Gorge Unit <br /> <br />Dunham Point Unit <br /> <br />Dominguez Reservoir <br /> <br />Grand Mesa <br /> <br />Upper Colo. Resource <br />Study <br /> <br />Fruitgrowers Dam <br /> <br />. <br /> <br />DPR or <br />Proposed <br />Feasibility <br />or Other <br /> <br />Slipped <br />Date of <br />Report <br /> <br />12/81 12/82 <br />to 3/83 <br />to 8/83 <br /> <br />12/84 3/85 <br />to 3/84 <br />to 3/85 <br />to 3/84 <br /> <br />5/80 2/81 <br />to 5/81 <br />to 8/81 <br />to 12/81 <br />to 1/82 <br /> <br />4/82 <br /> <br />12/82 <br />to 9/81 <br />to 12/ 81 <br /> <br />9179 <br /> <br />9/80 <br /> <br />9/82 <br /> <br />Colo. River 8asin [nfo. <br />8ase Program 6/84 <br /> <br />2 <br /> <br />. <br /> <br />Reasons for Slippage <br /> <br />study 12 m,?s. <br /> <br />time from 12/821 <br />get feasibility <br /> <br />3/12/80-Ltr approved extending <br />More realistic time frame. <br />5/6/80-Ltr from Provo extended <br />to 3/83 because E&RC unable to <br />estimates sooner. <br />6/80-Extended 3 mos. to conform to new review <br />guidelines. Two additional months added at <br />same time - from 3/83 to 8/83: <br />Report time changed to 3/84--was directed by <br />RD to shorten time taken to accomplish program. <br />3/80--Changed back to 3/85--more realistic <br />time frame to accomplish work. <br />1/14/81-Ltr to Durango shortened time to do <br />study by 1 year at request of W.O. <br /> <br />8/6/79-E&RC unable to furnish designs as soo~ <br />as scheduled. <br />8/27/79-After meeting in Grand Junction the <br />week of 8/20, discovered did not have realistio <br />plans for ES. Will take MOP team more work <br />and time to develop realistic alternatives. <br />Move date from 2/81 to 5/81. <br />6/4/80-Grand Junction requested change to <br />conform to new review guidelines-moved to 8/81. <br />12/4/80-Moved to 12/81-more realistiC time <br />frame. Could not get designs on time. <br />2/27/81-Moved 1 mO. to do field review-more <br />realistic time frame. Ltr of 2/27/81 from GJ <br />extended some appendix dates. <br />3/19/81-Ltr from RD extended report 1 mo. <br /> <br />2/14/80-S1ipped 9 moS. More time needed than <br />expected to get added data - 3/82 to 12/82 <br />8/1/80-At Summer Program Conf. decided to <br />write concluding report. Time moved back - <br />12/82 back to 9/81. <br />2/8l-Phone call from GJ on reports and <br />followup Itr of 3/14/81 moved appendix dates <br />so report changed to 12/81. <br />3/26/81-Report date change approved by RD. <br /> <br />Sent to public 6/18/80 - Concluding Report. <br /> <br />6/80 and 7/16/80-More time needed. Two <br />feasibility designs and estimates required. <br />8/80-Removed from schedule. <br /> <br />Removed from schedule. <br />