My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00967
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP00967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:28:38 PM
Creation date
10/11/2006 10:04:27 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1983
Author
DOI
Title
Salinity Control Program Study Report and Recommendations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />...... <br />t)l <br />A <br />~ <br /> <br />Project <br /> <br />Ute Indian Unit <br /> <br />CRWQIP <br />Price-San Rafael <br />Dirty-Devil <br />Uinta Basin WSI <br />Glenwood-Dotsero <br />Lower Gunnison wsr <br />McElmo Creek <br />Big Sandy <br />Meeker Dome <br /> <br />Power Peaking Study <br />Blue Mesa Unit <br /> <br />Glen C4nyon Uni t <br /> <br />Utah Lake Unit <br /> <br />. <br /> <br />DPR or <br />Proposed <br />Feasibility <br />or Other <br /> <br />. <br /> <br />Planning Program <br />Reasons for Slippages <br />January 1, 1979 to March 27, 1980 <br /> <br />Slipped <br />Date 0 f <br />Report <br /> <br />9/85 <br />8/86 <br />9/82 <br />11/83 <br />6/81 <br />3/83 <br />11/83 <br />8/82 <br /> <br />1/80 <br /> <br />9/80 <br /> <br />5/83 <br /> <br />9/79 <br /> <br />6/86 <br /> <br />12/82 <br />3/84 <br />11/81 <br />6/83 <br />8/84 <br />7/83 <br /> <br />9/80 <br />to 2/81 <br /> <br />7/82 <br />to 10/82 <br /> <br />8/83 <br />to 1/85 <br /> <br />April 13, 1981 <br /> <br />Reasons for Slippage <br /> <br />No change <br /> <br />As of 7/25/80 - no change to CRWQIP since <br />dates were set on March 6, 1979. <br />8/80 - Delay in negotiating professional I <br />services contract on Meeker Dome -3/82 to 7/83. <br />12/22/80-Ltr from Commr. said to do field- <br />level review separate from Wash/E&RC review. <br />2/12/81-RD's Itr changed due dates of all but <br />Dirty Devil & Morrow Point. (M.P. had already <br />been delayed 11 mos.) More realistic time <br />frame & addition of field-level review. <br />2/27/81-Ltr from GJ slipped Lower Gunnison <br />appendix dates. <br />3/10/81-Phone call ok'd doing field-level <br />review on W.Q. projects same time as Wash/ <br />E&RC reviews. <br />3/19/81-RD's Itr ok'd Lower Gunnison appendix <br />changes & Slipped report 2 mos. <br /> <br />8/6/79 slipped 9 mos. Because of lack of <br />personnel, the project office did not send a <br />letter requesting designs to E&RC soon enough. <br />Also, plan may change capacity. On 8/10/79 <br />design data was sent to E&RC & regional office <br />by Grand Junction. <br />6/4/80-Grand Junction requested change to <br />conform to ney review guidelines. <br />12/80-Changed to Concluding Report-same <br />deadline. <br />7/23/79-Because of lack of personnel in field <br />office, MOP team not organized on schedule <br />and Recommended Plan not selected on time. <br />Also, need for additional data collection <br />below Glen Canyon reo fish habitat, etc. <br />2/14/80-Ltr approved extending study 10 mos. <br />more. More realistic time frame. <br />2/l3/8l-Ltr from Durango requested extending <br />study 3 mos. Approved by ltr of 3/4/81 from <br />RD. Delay in drilling contract, etc. <br />6/80-Extended 3 mos to conform to new review <br />guidelines. <br />3/l3/8l-Ltr from Provo requested 18 mos. <br />extension for geological data. <br />3/27/81--18 mos. delay approved by RD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.