<br /> Table 4.--Cost allocation
<br /> ($1000) 3-1/4% Interest--July 1975 prices
<br /> Flood H i gh~lay Fi sh & wil dl He
<br /> Item Total Irrigation control improvement Recreation enhancement
<br /> Capitalized benefits 299,721 185,801 23,610 63,276 27,034 .
<br /> Alternative costs 130,954 al al
<br /> Justifiable investment 245,608 130,954 23,610 734 63-;276 27-;034
<br /> Separable costs 51,022 5,869 16,834 734 23,033 4,552
<br /> Project costs 27,405 5,395 15,475 675 4,175 1,685
<br /> Interest during construction 2,414 474 1,359 59 440 82
<br /> Capitalized OM&R 21,203 18,418 2,785
<br /> Remaining benefits 194,586 125,085 6,776 40,243 22,482
<br /> Percentage distribution 100.00% 64.28% 3.48:~ 20.68% 11. 56%
<br />N Joint CDsts 124,342 79,927 4,327 25,714 14,374
<br />+>
<br /> Project costs III ,620 71,750 3,884 23,083 12,903
<br /> Interest during construction 9,792 6,294 341 2,025 1,132
<br /> Capitalized OM&R 2,930 1,883 102 606 339
<br /> Total allocation 175,364 85,796 21,161 734 48,747 18,926 .
<br /> Project cost 139,025 77,145 19,359 675 27,258 14,588
<br /> Interest during construction 12,206 6,768 1,700 59 2,465 1,214
<br /> Capitalized OM&R 24,133 1,883 102 19,024 3,124
<br /> Annual OM&R 817.7 63.8 3.5 644.5 105.9
<br /> 21 The single purpose alternate for fish and wildlife and recreation would substantially exceed the benefits,
<br /> therefore, the estimate was omitted.