Laserfiche WebLink
<br />, <br /> <br /> Table 4.--Cost allocation <br /> ($1000) 3-1/4% Interest--July 1975 prices <br /> Flood H i gh~lay Fi sh & wil dl He <br /> Item Total Irrigation control improvement Recreation enhancement <br /> Capitalized benefits 299,721 185,801 23,610 63,276 27,034 . <br /> Alternative costs 130,954 al al <br /> Justifiable investment 245,608 130,954 23,610 734 63-;276 27-;034 <br /> Separable costs 51,022 5,869 16,834 734 23,033 4,552 <br /> Project costs 27,405 5,395 15,475 675 4,175 1,685 <br /> Interest during construction 2,414 474 1,359 59 440 82 <br /> Capitalized OM&R 21,203 18,418 2,785 <br /> Remaining benefits 194,586 125,085 6,776 40,243 22,482 <br /> Percentage distribution 100.00% 64.28% 3.48:~ 20.68% 11. 56% <br />N Joint CDsts 124,342 79,927 4,327 25,714 14,374 <br />+> <br /> Project costs III ,620 71,750 3,884 23,083 12,903 <br /> Interest during construction 9,792 6,294 341 2,025 1,132 <br /> Capitalized OM&R 2,930 1,883 102 606 339 <br /> Total allocation 175,364 85,796 21,161 734 48,747 18,926 . <br /> Project cost 139,025 77,145 19,359 675 27,258 14,588 <br /> Interest during construction 12,206 6,768 1,700 59 2,465 1,214 <br /> Capitalized OM&R 24,133 1,883 102 19,024 3,124 <br /> Annual OM&R 817.7 63.8 3.5 644.5 105.9 <br /> 21 The single purpose alternate for fish and wildlife and recreation would substantially exceed the benefits, <br /> therefore, the estimate was omitted. <br />