My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00733
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:27:33 PM
Creation date
10/11/2006 9:56:04 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.105
Description
Colorado River-Water Projects-Navajo
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/9/2000
Author
BOR
Title
Re-Operation of Navajo Dam-Plan of Approach to Prepare an EIS for Navajo Reservoir Operations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Native American consultation will be ongoing throughout the EIS process, An Indian Trust <br />Assets (IT A) report will be prepared, If appropriate, a report and consultation record on impacts to <br />sites and items covered under the North American Graves Protection and Repatriation Act <br />(NAGPRA) will be prepared, and a plan of action or agreement with the Tribes under NAGPRA will <br />be developed, <br /> <br />List of Cooperating Agencies <br /> <br />Jicarilla Apache Tribe <br />Southern Ute Indian Tribe <br />The Navajo Nation <br />Ute Mountain Ute Tribe <br />Albuquerque District, U,S, Army Corps of Engineers <br />USFWS. Albuquerque <br />BIA-NllP, Albuquerque <br />BIA. Southwest Region, Albuquerque <br />FERC. San Francisco, CA <br />NPS, Glen Canyon NRA, Page, AZ <br />San Juan Water Commission <br />City of Farmington <br />Southwestern Water Conservation District <br />NM Interstate Stream Engineer <br />Colorado Water Conservation Board <br /> <br />9. PUBLIC INVOLVEMENT <br /> <br />Reclamation's public involvement plan (PIP) is intended to inform the public as well as <br />solicit public responses and input regarding the public' s needs, values, and suggestions, It is <br />intended that public input will be factored into the development and evaluation of alternatives on an <br />on-going basis, Public input will be actively solicited by the following actions by Reclamation and <br />the cooperating agencies: <br /> <br />. Prepare and publish Notice of Intent to Prepare a draft EIS (completed); <br /> <br />. Announce the intent to prepare a draft EIS in the Federal Register and through press releases <br />(completed: Friday. October I, 1999); <br /> <br />. <br /> <br />Conduct public scoping meetings throughout the project area to provide information and <br />solicit input on resources of concern (completed: <br />November 3, 1999, in Farmington, New Mexico, <br />November 4, 1999, in Durango, Colorado, <br /> <br />I <br />I <br />I <br />[' <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.