Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />fI:'"J7 '3 <br />'J U \ J <br /> <br />12-6-91 <br /> <br />SCOPE OF SERVICES <br />Page 7 <br /> <br />Subtask 1.1.b: Ongoing Coordination and Public Involvement Activities <br /> <br />Throughout the project there will be a need for public information and participation <br />activities. These activities will be coordinated and conducted by the Sponsors Committee <br />but information and technical support for these activities will be required from the project <br />team. Under this subtask, information and support for ongoing public information and <br />participation activities will be provided as requested by the Sponsors Committee. It is <br />anticipated that information summaries and memoranda will be required in advance of all <br />Sponsors Committee and PFG meetings. <br /> <br />Subtask 1.2: Document Review and Existing Model SlImm'..y <br /> <br />The objective of this task is to insure that the project makes maximum use of <br />existing information related to Gunnison River basin hydrology and water management <br />practices by conducting a thorough review of previous efforts. This subtask will comprise <br />two subtasks. <br /> <br />Subtask 1.2.a: Collect and Review Previous Studies <br /> <br />In this subtask, Hydrosphere will collect, inventory and review previous studies and <br />available data related to Gunnison River basin hydrology, water use, water rights, <br />operations of existing water projects and plans for potential water projects. Hydrosphere <br />will submit a bibliography of published studies and data in its possession with a description <br />of any material in each upon which it contemplates reliance. The Sponsors' Committee will <br />review the bibliography and advise Hydrosphere of any other resources which ought to be <br />obtained and reviewed. <br /> <br />Subtask 1.2.b: Summary and Critical Review of Existing Model <br /> <br />To facilitate the Sponsors Committee's guidance regarding the design of the <br />simulation component of the Planning Model, Hydrosphere will critically review and <br />summarize in layman's terms the assumptions and operation of the existing basin model. <br />Particular attention will be paid to description of project operating procedures as they are <br />embodied in the existing model. It is intended that the summary will explain the existing <br />model and that the critical review will provide a readily understandable "jumping-off place" <br />for discussions of desired modifications and enhancements to that model. The Task <br />Memorandum prepared at the conclusion of Subtask 1.2 will include the summary of the <br />existing model and a discussion of the procedures, findings, conclusions, and <br />recommendations resulting from the performance of Subtask 1.2. <br />