Laserfiche WebLink
<br />~{ffi <br /> <br />An off-farm program to reduce seepage and associated salt loading by about two- <br /> <br />thirds would involve such practices as using pipe or concrete lining to repair <br /> <br />about 200 miles of the off-farm distribution system. The off-farm program would <br /> <br /> <br />reduce salt loading by about 10,000 tons. Program costs for off-farm improvement <br /> <br />of 200 miles of canals and laterals at $10 per installed foot of 12-18" concrete <br /> <br /> <br />pipe would be about $11 million. Average annual cost would be about $91 per ton <br /> <br /> <br />of salt load reduction. <br /> <br />(,.-> <br />l--" <br /><::.I <br />Co/I <br /> <br />Table 5 -- Water and Salt Balance, Future With Project Conditions, <br />San Juan Salinity Control Study, Navajo Nation Unit (5,800 acres) <br /> <br /> ----WATER-- <br /> -AF /A- -AF /Yr- <br />DIVERSION 5.5 31,900 <br />RETURN TO RIVER (Off-farm) <br />Canal Seepage 0.5 2,900 <br />FARM DELIVERY 5.0 29,000 <br />RETURN TO RIVER (Onfarm) <br />Ditch Seepage .0.3 1,700 <br />FIELD DELIVERY 4.7 27,300 <br />VEGETATIONAL USE <br />Crop Consumptive Use 2.5 14,500 <br />Phreatophyte Use(lO%) 0.5 2,900 <br />RETURN TO RIVER (Onfarm) <br />Surface 0.4 2,300 <br />Deep Percolation 1.3 7,500 <br />RETURN SUMMARY <br />Canal Seepage 0.5 2,900 <br />Ditch Seepage 0.3 1,700 <br />Surface 0.4 2,300 <br />Deep Percolation 1.3 7,500 <br />TOTAL 14,400 <br /> <br />OFF-FARM SALT PICK UP (CANAL) <br />ONFARM SALT PICK UP <br />TOTAL SYSTEM SALT PICK UP (Returns less Diversion) <br /> <br />-------SALT------- <br />--EC-- --T/AF-- -T/yr-- <br /> <br />0.52 0.45 14,400 <br />2.40 2.10 6,100 <br />0.52 <br />2.40 2.10 ,'-{~.:<.. <br />3 70;""";<1 <br />0.52 ' ~g~~ <br /> <br />0.52 0.45 1,000 <br />2.40 2.10 15,700 <br />2.40 2.10 6,100 <br />2.40 2.10 3,700 <br />0.52 0.45 1,000 <br />2.40 2.10 15,700 <br /> 26,500 <br /> <br />4,800 TONS (0.8 T/A) <br />7,300 TONS (1.3 T/A) <br />12,100 TONS (2.1 T/A) <br /> <br />The difference between the salt pick up values shown in Tables 4 and 5 is <br />indicative of how project action might reduce salt pick up: <br /> <br />OFF-FARM <br />ONFARM <br />TOTAL <br /> <br />14,400 T <br />34,000 T <br />48,400 T <br /> <br />(0.8 T/A) - <br />(1. 3 T/A) <br />(2.1 T/A) <br /> <br />(2.5 T/A) - 4,800 T <br />(5.8 T/A) - 7,300 T <br />(8.3 T/A) - 12,100 T <br /> <br />16 <br /> <br />. . <br /> <br />9,600 T (1.7 T/A) <br />26,700 T (4.5 T/A) <br />36,300 T (6.2 T/A) <br /> <br />.~.;-'>-)'. <br />.~,-';:.-.:,': <br />