My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00595
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00595
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:48 PM
Creation date
10/11/2006 9:50:43 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
4/21/1980
Title
RFP 40-S1359 Salinity Investigation of Glenwood-Dotsero Springs Unit
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />support the contractor's data, for example; on disposal features for the <br />entire unit or collection features at Dotsero Springs. In accordance with <br />section 5.5, the proposal will include an activity network. Phase I work <br />will culminate in a Phase I Report as described in section 5.4. <br /> <br />4.3 Phase II Work <br /> <br />Phase II work will focus on evaluating and preparing reports on the <br />feasibility of the selected plan or plans identified during the Phase I <br />studies. Phase II work requirements will depend on the components of the <br />selected plan and whether the plan is nonstructural or structural in nature. <br />If the plan involves engineering structures, the contractor will compile <br />engineering design data as described in section 6, and also may prepare <br />designs and estimates as described in section 7.- Progress and technical <br />report requirements are described in section 6~2.3 and will culminate the <br />contractor's Phase II activities. <br /> <br />4.4 Summary of Key Events and Activities <br /> <br />A summary chart illustrating the key Phase I events (detailed <br />in section 5) is attached at the end of the Work Statement (see Appendix 5). <br />Also attached is a list of reports and a list of meetings required in Phase I <br />(see Appendix 2). <br /> <br />4.5 Response <br /> <br />No response is required for section 4. <br /> <br />5. STATEMENT OF WORK, PHASE I INVESTIGATIONS <br /> <br />Phase I will consist of problem identification, quantification, and <br />verifying activities; identification of alternative plans to resolve the <br />problem; and the preparation of appraisal designs and cost estimates, and <br />environmental assessments. <br /> <br />~.l Definition of Days <br /> <br />All reference to days in this contract mean Calendar Days. <br /> <br />5.2 Problem Identification, Quantification, and Verifying Activities <br /> <br />5.2.1 Problem Identification and Quantification <br /> <br />Based on existing data (see section 3.1.1 above), the <br />contractor will within 125 days after award of this contract submit to <br />Water and Power a report as described in section 5.4.1 containing the con- <br />tractor's initial hypothesis that describes the physical and chemical pro- <br />cesses at work in the Glenwood-Dotsero Springs area. <br /> <br />D-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.