Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />@ Ht7l. TH& Pu.LIC: R.CORD CORPORATION <br />Al.,L RIGHTS RIl8.U'V.O <br /> <br />tCR", 4-7' <br /> <br />Page 7 <br /> <br />~ Treatment Plant Monitoring Type of <br />N, Design Capacity Frequency Sample <br />~ <br />~ 00::.1.0 MGD Quarterly Di screte <br /> 1.0 - 5.0 MGD Monthly Co~osi te <br /> 5.0 - 50.0 MGD Week ly Compos i te <br /> >50.0 MGD Daily Composite <br /> <br />---------------------------------------------------------------- <br /> <br />1. Analysis for salinity may be either as total dissolved <br />solids (TDS) or by electrical conductivity where a satis- <br />factory correlation with TDS has been established. The <br />correlation should be based on a minimum of five different <br />samples. <br /> <br />2. Monitoring of the intake water supply may be at a reduced <br />'frequency where the salinity of the water supply is relatively <br />uniform. <br /> <br />,\, <br /> <br />3.10.5A written statement of the basis and purpose justifying this regulation <br />has been prepared and adopted by the Commission. This written statement is <br />hereby incorporated in these regulations by reference, in accord with C.R.S. <br />1973, 24-4-103, as amended. <br /> <br />-'=, <br /> <br /> <br />THE CODE OF COLORADO REGULATIONS <br /> <br />5 CCR1002. 11 <br /> <br />