Laserfiche WebLink
<br />Q <br />~. <br />~ <br />~ <br /> <br />. <br /> <br />e. <br /> <br />. <br /> <br />Page 8 <br /> <br />APPENDIX A <br />GUIDANCE ON NEW CONSTRUCTION DETERMINATION <br /> <br />For purposes of determining a new construction, a source should be con- <br />sidered new if by October 18, 1975, there has not been one of the follow- <br />ing: <br /> <br />(1) Significant site prepara:ion work such as m~jor clearing <br />or excavation; <br /> <br />(2) Placement. assembly, or installation of unique facilities <br />or equipment at the premises where such facilities or <br />equipment will be used; <br /> <br />(3) Any contractual obligation to purchase unique facilities <br />or equipment. Facilities and equipment shall include only <br />the major items listed below, provided that the value of <br />such items represents a substantial commitment to construct <br />the facility: <br /> <br />(a) structures; or <br /> <br />(b) structural materials; or <br /> <br />(c) machi nery; or <br /> <br />(d) , process equipment; or <br /> <br />(e) construction equipment. <br /> <br />(4) Contractual obligation with a firm to design, engineer, and <br />erect a completed facility (i .e., a turnkey plant). <br /> <br />5 CCR 1002.11 <br /> <br />THE CODE OF COLORADO REGULATIONS <br /> <br />( <br />, <br /> <br /> <br /> <br />> "'~" <br />