Laserfiche WebLink
<br />OO.289B <br /> <br />San Juan RC&D Area <br /> <br /> <br />Dolores County Roads CAT--Construction of two phases of this <br />project have been completed. <br /> <br />Kings Consolidated Ditch (F.I.)--Construction of Phase I <br />completed. The design for Phase II has been completed. <br /> <br />Morse CAT--Construction completed on this stream stabiliza- <br />tion proj ect. <br /> <br />Navajo State Recreation Area CAT--Construction underway. <br /> <br />Yellow Jacket CAT--Construction of two phases of the project <br />have been completed. One phase is remaining. <br /> <br />Pagosa Schools CAT--Phase I construction completed. <br /> <br />Four Corners CAT--A measure plan to provide stream stabiliza- <br />tion in the Dolores River has been completed. <br /> <br />Cortez-Montezuma Co. Airport CAT--A plan for erosion control <br />for the airport is being developed. <br /> <br />Lower Florida F.I.--A plan to rehabilitate this irrigation <br />system is being developed. <br /> <br />NEW MEXICO: Lower Colorado Basin <br /> <br />Construction on the flood control portion of the Sunset Canal <br />RC&D Measure Plan was completed July 14, 1978. <br /> <br />ECONOMICS, STATISTICS, AND COOPERATIVES SERVICE <br /> <br />ARIZONA <br /> <br />Little Colorado Cooperative River Basin Study <br /> <br />The following working materials were completed: (1) popula- <br />tion projects for the New Mexico part of the Little Colorado <br />River Basin by county, hydrologic area, and city or town, <br />(2) population projections for hydrologic sub-areas in the <br />New Mexico part of the Little Colorado River Basin by county, <br />and town or city, and (3) estimates of base period livestock <br />numbers for the New Mexico hydrologic sub-areas. <br /> <br />Work is underway on employment consistent with the base period <br />, and projected population for the Little Colorado River Basin <br />counties. <br /> <br />c-35 <br /> <br />~',-"""J"'II""'-~''''.~''f!'V''". '~ ~''''''>"'''^~'''~~_.' <br />