My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00486
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00486
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:15 PM
Creation date
10/11/2006 9:47:20 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
11/27/1978
Author
PSIAC
Title
Minutes of the 78-3 Meeting - November 27-28 1978
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Springerville Irriiation Measure: Construction plans are <br />complete. Start of constr~ction has been delayed because of <br />the lack of RC&D construction funds. <br /> <br />CALIFORNIA: North Cal-Neva RC&D <br /> <br />Construction has been completed on the Cow Creek Critically <br />Eroding Area Measure. The Susanville River Measure Plan <br />has been approved for construction and is currently waiting <br />for funding. This plan includes streambank stabilization <br />and basic recreation facilities. Construction work will be <br />accomplished in three phases over a three-year period. <br /> <br />High Sierra RC&D <br /> <br />Construction has been completed on the Secret Ravine School <br />Critically Eroding Area Measure. Second phase construction <br />work on the Georgetown Airport Critically Eroding Area Measure <br />has been completed. <br /> <br />Central Coast RC&D <br /> <br />Construction has been completed on the first contract of the <br />Pinto Lake water based recreation and fish and wildlife <br />enhancement measure. A contract is being prepared for con- <br />sulting firm to design the ,remainder of the Pinto Lake <br />Measure Plan. <br /> <br />Carson-Walker RC&D <br /> <br />Construction is underway on the Kingsbury Critically Eroding <br />Area Measure. Work was nearly complete when heavy snows <br />struck the area, and completion must now be delayed until <br />after the late spring thaws. The Phase II contract will be <br />let in late spring 1979. <br /> <br />COLORADO: Colorado Big Country RC&D Area <br /> <br />Hayden F. P. Measure--Final design completed. The measure <br />is expected to be implemented with State funds. <br /> <br />Two-Rivers Park (REC) Measure--At the sponsor's request a <br />revision for this measure plan is being developed. <br /> <br />Eagle River Park (REC)--Planning for a recreation development <br />along the Eagle River near the City of Eagle is underway. <br /> <br />c-34 <br />