Laserfiche WebLink
<br /> <br />WYOMING <br /> <br />ARIZONA <br /> <br />Uintah Basin Salinity Study <br /> <br />Because of the lag in the Bureau of Reclamation's schedule <br />for comp1eting planning on the conveyance system improvements, <br />the USDA report will be distributed as an interim document. <br />This will be done about March I, 1979. It is still hoped <br />that a combined report can be developed covering all phases <br />of salinity reduction programs for the Uintah Basin. <br /> <br />Price and San Rafael Rivers Salinity Study <br /> <br />Gathering of field data <br />of this data has begun. <br />completed in May 1981. <br /> <br />is nearing completion. Some analysis <br />The USDA study is scheduled to be <br /> <br />Green River Basin <br /> <br />The main report for the USDA Green River Basin Cooperative <br />Study has been completed and is presently undergoing final <br />printing and binding. Distribution of this report will be <br />made shortly after January 1, 1979. <br /> <br />Big Sandy Salinity Study <br /> <br />Work is continuing on the Big Sandy Salinity Study as a part <br />of the Colorado River Basin Salinity Control Program. On-farm <br />inventories have been completed and water and salt budgets for <br />the present condition have been prepared. Information meetings <br />have been held with local sponsors and state and Federal <br />agency personnel, to review findings and discuss alternatives <br />that need to be considered for reducing salinity to the <br />Colorado River system. Preliminary alternative plans have <br />been evaluated and reviewed by the coordinating committee. <br /> <br />WATERSHED PLANNING <br /> <br />Cottonwood Wash Watershed <br /> <br />The Navajo County Board approved sponsorship of recreation <br />storage in the reservoir at a meeting on August 7, 1978. <br />This decision clears the way for completing planning on this <br />proj ect. <br /> <br />Lower Queen Creek Watershed <br /> <br />The preliminary draft watershed plan and environmental impact <br />statement have been reviewed by the staff and are currently <br />undergoing informal interagency review, Comments are due <br />December 29, 1978. The plan and EIS will be submitted for <br />WTSC review about February 1, 1979. <br /> <br />c-28 <br />