My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00486
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00486
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:15 PM
Creation date
10/11/2006 9:47:20 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
11/27/1978
Author
PSIAC
Title
Minutes of the 78-3 Meeting - November 27-28 1978
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002'886 <br /> <br />COLORADO <br /> <br />NEVADA <br /> <br />Cooperative Studies <br /> <br />Cooperative river basin reports have been completed for all <br />the basins in the Colorado River drainage. <br /> <br />Salinity Studies <br /> <br />Grand Valley--Implementation of On-farm Salinity Control <br />project is underway. Current appropriations include <br />$1,772,000 in ACP funds for cost-sharing. Priority is being <br />given to farms in the Reed Wash area. <br /> <br />Lower Gunnison Basin--Alternative plans are being developed <br />for the On-farm Salinity Control. Inventory and evaluation <br />of Wetland habitats completed. The Wetland inventory identi- <br />fied the source of water for each Wetland area. <br /> <br />McElmo Creek--Data collection was started in October. An <br />inventory of 10 percent of the farms is planned. Coordination <br />with the Bureau of Reclamation is being carried out through <br />the MOP team process. <br /> <br />Colorado River Basin Salinity Study--Virgin River Unit <br /> <br />The Plan of Study was revised and detailed schedules prepared <br />for items to be completed during fiscal year 1979. Major <br />emphasis is being given to this study during fiscal year 1979 <br />in Nevada. <br /> <br />Virgin River Cooperative River Basin Study <br /> <br />Identification and concurrence by the states of Arizona, <br />Nevada and Utah problems to be studied is pending. Feasibil- <br />ity of retaining the study is to be reassessed early in 1979. <br /> <br />NEW MEXICO: Lower Colorado Basin <br /> <br />UTAH <br /> <br />Information and data continue to be developed for the New <br />Mexico portion of the Little Colorado River Basin Report. <br />A Recreation Working paper has been completed and a draft <br />Flooding Working paper is underway. <br /> <br />Bear River Basin <br /> <br />This study has been completed. The summary report is being <br />typed for final printing and should be distributed about <br />February I, 1979. <br /> <br />C-27 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.