My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00442
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:04 PM
Creation date
10/11/2006 9:46:07 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1981
Author
USDOI
Title
25th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Estimated Construction Costs of Colorado River Storage Project <br /> <br />:md Participating Projects (Secllon 5 and Section 8 FaCilitlesl <br />with Increases from 1956/lnitlal) 10 <br />September 1981lEstlmatedl <br /> <br /> <br />Alle f\O Pd'''~' TO So~",., (,,,c.. !'~""r'Tlf''' <br /> <br />site. A Contract fot Compfetion of Still. <br />water Tunnel IS under negollatlon. <br /> <br />Contracts were awarded for the fot/owlng <br />work: Jordan Aqueduct Flow ContrOl <br /> <br />5,5 <br /> <br />$268 <br />Mlllton <br /> <br />50 <br /> <br /> <br />Loc~-no ....est "'to f-tao<-s InO;oI Pcmal, P"cnf:'Snt> RNe, Vali(oy <br /> <br />Structures and ReaCh 3 completion; <br />Remedial grouting. Ellploratory Drilling. <br />Jordanelte DamSlte. Starvation Dam; <br />E)(ploratory Drilling. Wasatch Aqueduct <br />Tunnel portals; ROCk Creek Road repair <br /> <br />45 <br /> <br />$1.355 <br />MIllion <br /> <br />Additional Section 8 Costs <br /> <br />35 <br /> <br />Other Cost Changes <br />IChanges 'n Plan. i=leanalYS1S of Quantities and Unll <br />Pllces leglslat,yE' Add'tlons. UnfOfeseen CondlhOns <br />erCl <br /> <br />40 <br /> <br />30 <br /> <br />$1.796 <br />Mllhon <br /> <br />Cost Increases Due To Inllation <br /> <br />Subsequent New Authorizations <br />1963 Na.,.ato Ind,an Irrlgar'on P'Ojeel, San Juan. <br />Chama <br />1965 BOSlwlC. Par" Fruolland Mesa, SaveIV.POI Hoo~ <br />1968 An,mas-LaPlata Dallas Cfeel< Dolofes. San <br />Moguel West Ollllde_ Umlah Unol-CUP <br /> <br />Initial Authorizations' (1956) <br />Stofale Un'ts Aspinall ICurecanlll. Flammg GOfQe, <br />Gien Can~'on NavajO <br />Pa'I'CiPalong Prolects FjOflOa. PilorlOil, S'II. Smoll'1 <br />Fo'~ Hammond_ Centfal Ulah. Emef~ Counh Lyman <br />Seetl5~adee, La Balge' P,ne Rove' E.lenSIOn' <br /> <br />2,5 <br />1,0 <br /> <br />- <br /> <br />1.5 <br />o <br /> <br />,5 <br /> <br />SlO9 <br />MillIon <br />$936 <br />Million <br /> <br />"~ S760 ""lhOl1 ..as ''''loa''. ar,prOr,"ale<l <br />CoO!l'eS5 <br />""'''~,nll''!''''lel..,''1962 <br />,a"l"O""l'dm 1971 <br /> <br />-...~ <br />, <br />.~ <br />,~' <br /> <br />~!'QI <br /> <br />i:l: <br />" ... <br /> <br />...,.,..... <br />......~ <br /> <br />and paving. Pioneer Canal Rehabilitation; <br />Stillwater Tunnel inlet repair; and Straw. <br />berry Bay RecreatIon Facilities. <br /> <br />Jensen Unit - The block number 1 drains <br />were Completed. Contracts were awarded <br />'or lhe Red Fleet Campground and the <br />TyzaCk Pumping Plant and Aqueduct. <br /> <br />Dolores Project: WOrk conllnues on <br />MCPhee Dam. the major feature of the <br />DOlores Projecl. ConstructIOn progress is <br />ahead of schedule. The contractor Con- <br />tinued work on the cut-off trench, <br />gloutlng. seleCtive level outret works. river <br />outlet works. SpHfways. and Stilting <br />basms. About 50 percent of the work was <br />complele by the end of the fiscal year. A <br />contract for upgrading and paving the <br />MCPhee Access Road and surfacing the <br />Dolores Fjeld Station was awarded <br />September 9, 1981. <br /> <br /> <br />Dallas Creek Project: OWing the past <br />year the contractor on Ridgway Dam Stage <br />One cOntmued work on the cut-ofl trench, <br />grOut curtain, oullet work. and spillway <br />stilting basin. Work was initialed on the <br />embankment. A Contract for completion of <br />the Ridgway Dam should be awarded in <br />late fiscal year 1982. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.