My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00442
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00442
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:26:04 PM
Creation date
10/11/2006 9:46:07 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1981
Author
USDOI
Title
25th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Construction Activities <br /> <br /> <br />T"'.'w"..nl C'...,. P'l"'hfW <~." o.J,< "Ql()JT1(l ,,'l! c-~m..., <br /> <br />The major construction activities of the <br />Upper Colorado Regional Office In fiscal <br />year 1981 are on the Bonneville Unit. <br />Central Utah Project; Dolores PrOJect, <br />Dallas Creek PrOJect. and the Colorado <br />River Basin Salinity Control Project. Minor <br />construction or rehabilitatIon was also in <br />progress on the Jensen Unit of the <br />Central Utah Project. Glen Canyon Unit. <br />Flaming Gorge Unit. Seedskadee Project. <br />and the Wayne N. Aspinall Unit of the <br />Colorado River Storage Project. <br /> <br />Central Utah Project: Bonneville Unit - <br />Work on the following features was <br />completed in fiscal year 1981 Currant <br />Creek pipeline repair: Stillwater Tunnel <br />backfill grouting: Strawberry and Currant <br />Creek Recreation Roads: Exploratory <br />Drilling. Fifth Water Powerplant; Work <br />Center building. Currant Creek Recreation <br />Area: Exploratory Drilling. MonkS Hollow <br />DamSlte. Soldier Creek Sewage Lagoons. <br />Strawberry Reservoir Recreation Area: <br />Concrete test placement. Upper Stillwater <br />Dam: Water HollOw Bridge and Explora. <br />tory Drilling. Fifth water ReservOir Area <br />and Discharge Tunnel. <br /> <br />4 <br /> <br />Work continued on the following in 1981: <br />Vat Tunnel; Val Diversion Dam and West <br />Fork Pipeline: Jordan Aqueduct. Reach 3: <br />Hades and Rhodes Tunnel and Appur. <br />lenant Structures: Holing through at inlet <br /> <br /> <br />50--"_.... ~~ 0' II .",on t"l'UPP<" St,llwal..., <br /> <br />of Rhodes Tunnel in November 1980: <br />Soldier Creek and Aspen Grove Recrea. <br />tion Areas: StrawbeffY Bay and East Side <br />Recreation Roads; and Exploratory <br />Drilling. Jordanelle Dam and ReservOir <br /> <br />Construction Costs - Annual and Accumulated <br /> <br /> Annual Accumulated <br />FIscal year 1972 $ 43.187.756 <br />To date as ot June 30. 1972 S 928.233.015 <br />Fiscal year 1973 46.588.918 <br />To date as of June 30. 1973 974.821.933 <br />Fiscal yeal 1974 36.986.459 <br />To dale as 0' June 30. 1974 1.011.808.392 <br />Fiscal year 1975 52.303.718 <br />To dale as of June 30.1975 1.064.112.110 <br />Fiscal year t976 70.281.741 <br />To dale as of June 30. 1976 1.134,393.851 <br />TranSitional quarter and <br />fiscal year 1977 131,750,705 <br />To dale as of September 30. 1977 1.266.144.556 <br />Fiscal year 1978 89,eXl1.375 <br />To dale as 01 September 30.1978 1.355.145.931 <br />Fiscal Year 1979 95.067.380 <br />To dale as of September 30. 1979 1.450.213.311 <br />Fiscal Year 1980 130.357.851 <br />To date as 01 September 30. 1980 1.580.571.162 <br />Fiscal Vear 1981 166.678.707 <br />To dale as of September 30. 1981 1,747,249.869 <br />
The URL can be used to link to this page
Your browser does not support the video tag.