My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP00351
CWCB
>
Water Supply Protection
>
Backfile
>
1-1000
>
WSP00351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:25:33 PM
Creation date
10/11/2006 9:40:48 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1965
Author
Unknown
Title
Quarterly Reports - Colorado-DOI - 1965
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />(. <br /> <br />::<; <br /> <br /> <br />,.--,,:: <br />.,::.:. <br /> <br />,'.'", <br /> <br />lt~ <br /> <br />:';" <br /> <br /> <br />OO'l'3?l <br /> <br />_0,'; <br /> <br />-- <br />'\~; <br /> <br />,",'- <br />':, <br /> <br />'I,,' _~: <br /> <br />The Hughes Aircraft Company has entered into a contract with the Bureau <br />of Reclamation to prepare economic impact studies of the Boulder Canyon <br />Project and projected impacts of the proposed Bridge Canyon and Marble <br />Canyon dams. The contract was executed on March 24, 1965, and is to <br />be completed within 60 days. <br /> <br /> <br />,Orme Unit, Arizona -- The Corps of Engineers has submitted its report <br />"Flood Control Benefits for Orme (Maxwell) Dam, " dated March 1965, <br />Cost estimates were prepared for a canal on the south side of the Salt <br />River. Reconnaissance cost estimates were also prepared for a dam <br />across the Salt River at the Granite Reef Dam site. Six new reservoir <br />operation studies have been completed and are being analyzed. <br /> <br />PalmdaleProject, California -- A draft of report has been completed <br />and is receiving interoffice review. The Reg ional Director's propos ed <br />report was scheduled for completion in April 1965, but has beenresched- <br />uled to'July 1965'. <br /> <br />Moapa Valley Pumping Project, Nevada -- Work continued on the estab- <br />lishment: of a triangulation network for the project. Aerial photography <br />and topographic mapping of the project area will be performed under con- <br />tract. <br /> <br />Investigations in Progress -- Existing <br /> <br />All-American Canal System -- Water Salvage Coachella Canal. Work <br />continued on drafting the report and appendices. <br /> <br />* * >:c >:< * <br /> <br />For a complete review of project planning activity, see Planning Status <br />,Summary on following pages. <br /> <br />~~ <br /> <br />Current Reports and Studies <br /> <br />.;.; <br />';~ <br />:;? <br />!..., <br />'0' <br />j: <br />N'~ <br />, <br /> <br />The -Supplement to the January 1964 Report on the Southern .Nevada Water <br />Supply Project, Nevada, and the Supplement to the Appendices were, <br />revised and updated to April 1965 increasing the interest rate from <br />3 percent to 3-1/8 percent. ,Senate hearing,S on the project were held <br />in Washington, D. C. on May 20, 1965. <br /> <br />~. <br /> <br />5 <br /> <br /> <br />A draft of memorandum report pres,enting ,the results of the reconnais- <br />sance studies of a propos ed hydroelectric powerplant development at the <br />Headgate Rock Dam was completed. The report is being prepared under <br />a cooperative contract with the Bureau of Indian Affairs. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.