Laserfiche WebLink
<br />.,<1 <br />'! <br /> <br />0") <br />".j <br />co <br />C'\J <br />Cl <br /> <br />'-~) <br />c~) <br /> <br />of the Conejos River at the Mogote and Lasauses gages to a maximum <br /> <br />of 2,500 and 1,600 cubic feet per second, respectively. <br /> <br />At such a time as evaluation of storm data indicates that inflow plus <br /> <br />storage in reservoir will exceed the spillway and outlet works <br /> <br />capacities, the Chama Field Division personnel will be instructed to <br /> <br />maintain the outlet works gates in a full open position. <br /> <br />Specific instructions pertaining to flood control release will be <br /> <br />furnished to Chama Field Division personnel by the Corps of Engineers <br /> <br />or the URGBP office. All possible action should be taken to provide <br /> <br />for safety of the structure and safety to the public, to minimize <br /> <br />'.-, <br /> <br />property damage, and to protect the interests of the Government and <br /> <br />the Conejos Water Conservancy District. <br /> <br />IF ALL COMMUNICATIONS FROM THE DAM ARE LOST and there is potential for <br /> <br />._f:~ <br /> <br />flooding and Subsequent failure of, the dam, the following actions are <br /> <br />to be taken: <br /> <br />a. Flood control pool emptY--Continue operating for irrigation <br /> <br />interests. Attempt to reestablish communications. <br /> <br />>"-< <br /> <br />b. Flood control pool being encroached upon--During major <br /> <br />flood periods, flood releases will not be made through the conduits <br /> <br />except as may be required for safety of the structure, until such <br /> <br />A-14 <br /> <br />- <br />